Font Size: a A A

Biomass Gas Centralized Gas Supply Project Feasibility Study

Posted on:2016-04-15Degree:MasterType:Thesis
Country:ChinaCandidate:S H LiFull Text:PDF
GTID:2309330482455241Subject:Management
Abstract/Summary:PDF Full Text Request
Biomass energy belongs to the new energy and renewable energy, is also a kind of clean energy, biomass energy industry development can reduce the dependence on traditional energy sources such as oil, gas and coal, the global environmental protection calls for a growing and growing fears of non-renewable energy will eventually run out of big background, the development of biomass fuel gas project undoubtedly has important significance.Biomass direct combustion is the most original human biological energy, the most traditional way of using direct combustion way of early low energy efficiency and pollution is serious, would later gasification combustion new technology applied in the biomass fuel, biomass gasification is one of the biomass conversion process of the latest technology, characterized by high energy efficiency, environmental friendly, wide applicable range, low cost, can achieve industrialization and large-scale use of biomass gasification represents the human biological energy into a new era.Feasibility study is an important work of the early stage of the project investment, project units is the important basis for scientific decision-making of investment, also be the basis of project units business negotiations. Project feasibility study including technical feasibility and economic feasibility study. This article through to project product market analysis, project construction conditions, the analysis and research of the economic and social benefits, project feasibility of M company biomass gas and gas centralized supply the scientific reasoning, to evaluate the economic and social benefits of the project. This study of the industrialization of the research of the biomass fuel gas and gas centralized supply has the reference value, the result is very important to decision makers.M company intends to biomass gas gas supply project in the project,therefore, according to the requirement of the project feasibility study, from the market demand analysis, construction condition, investment estimation and financing options, economic and social benefits and other aspects for analysis and argument. Results show that, after the project, which can realize an annual output of 190.08 million cubic meters of biomass gas production scale, with annual sales of 151.3 million yuan, over taxes (income tax, business tax and additional) 17.7 million yuan. The implementation of this project not only can promote the development of biomass energy industry I, drive the biomass energy technology progress in China, and will be through the talent flow and technical exchanges for the region and even the entire social and economic development brings good external benefits. Results show that the demonstration project implementation has a positive meaning, good economic benefit and social benefit.
Keywords/Search Tags:Biomass, energy, centralized gas supply, Feasibility
PDF Full Text Request
Related items