Font Size: a A A

The Project Planning And Implementation Strategy Of Hydraulic Pneumatic Industry Project In Henan HT Company

Posted on:2017-03-18Degree:MasterType:Thesis
Country:ChinaCandidate:Q ZhangFull Text:PDF
GTID:2309330485979940Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Henan HT company affiliated to China XX group company. According to the group company centralized layout, cluster development, intensive use of resources, improve the core competitiveness of enterprises, build the domestic first-class, international advanced aerospace hydraulic pneumatic R & D and production base of requirements, using HT Company in Henan Province, Zhengzhou City, good location, development environment and preferential policies, in Zhengzhou, the open development zone in Henan HT hydraulic pneumatic industrial projects, the project name for Henan HT hydraulic gas dynamic industrial. However, in the development process faced with the government’s municipal construction lags behind, the project surrounding facilities are not in place, the existing part of the product external competition is fierce and so on. How to effectively solve the difficulties faced by the development of hydraulic and pneumatic industrial project, the development of scientific planning and implementation strategy is an urgent problem to be solved in Henan HT company.The collected on the basis of a large number of domestic and foreign literatures, with project management as the theoretical basis, draw lessons from the successful practice of industrial projects on the development of and systematically studied Henan HT hydraulic gas dynamic industrial project planning and implementation strategy. First of all, through the development of hydraulic and pneumatic industry status and the development strategy of China’s XX group, the company’s HT hydraulic pneumatic industrial project construction and the problems faced. Secondly, the advantages, disadvantages, opportunities and challenges of HT hydraulic pneumatic industry project are analyzed by using SWOT analysis as a tool. Then, the overall planning and implementation plan of the project of Henan HT hydraulic and pneumatic industrial project is established. Finally, through the analysis of the technical risks, market risk, financial risk and policy risk of the project, the project implementation strategy of Henan HT hydraulic and pneumatic industry is provided.The characteristic and innovation of this paper lies in:(1) through the SWOT analysis, discusses the Henan HT hydraulic gas industrial projects on the advantages, disadvantages, opportunities and challenges; ii) the formulation of the overall objectives of Henan HT Industrial project, project design, environmental protection scheme, occupational health solutions, investment estimation scheme;(3) the risk in technology, market, financial and policy analysis provides Henan HT hydraulic gas industry project implementation strategy.The research of this paper not only provides a feasible plan and implementation strategy for the project development of HT hydraulic and pneumatic industrial project in Henan, but also provides an analytical approach for the development of other industrial projects.
Keywords/Search Tags:Hydraulic pneumatic industrial project development, Planning scheme, SWOT analysis, Implementation strategy
PDF Full Text Request
Related items