Font Size: a A A

Research On The Performance Assessment System Of Feng Tai Shantytown Rebuilding Project

Posted on:2017-05-14Degree:MasterType:Thesis
Country:ChinaCandidate:F Y LiFull Text:PDF
GTID:2309330485989547Subject:Project management
Abstract/Summary:PDF Full Text Request
In the 1980s, the concept of project management was introduced into our country from abroad, from then on, experts and scholars are very keen on the study, and obtained some phases of research. Among them, there are a lot of is the in-depth research of the construction project management in the implementation stage, and the corresponding evaluation index system is established. But it is limited to the study of a certain or some influence factors in the evaluation, failed to system to conduct the thorough research to the implementation stage of the overall evaluation index, so the evaluation system of the implementation of the project carried on systematic discussion is necessary.This article mainly around the following study, first, the development of project management in our country at present situation analysis, and summarize the related evaluation of engineering project implementation theory and method.Secondly, in the study of the theories and methods of project management, on the basis of according to China national chemical engineering third construction co., LTD. (hereinafter referred to as the Chinese three houses) of fengtai county the shacks of huainan city renovation project construction situation, combining with the characteristics of the project construction and build the corresponding evaluation index system of project implementation. Index system including total quality control, schedule control, investment control, security management, contract management, risk management, organization and coordination index of seven first-level indicators, then seven indicators divided into 32 secondary indexes.After then, the evaluation method of comparison, combination of key factor analysis, expert scoring method and multi-level fuzzy comprehensive evaluation method and analytic hierarchy process comprehensive method, to do evaluation index system research. Finally, validated in fengtai county the shacks renovation project, for example, to calculate the weights of indicators at all levels, and USES the method of multi-level fuzzy comprehensive evaluation to evaluate projects, implemented the project management of the results of the overall effect is good.Based on the index system of evaluation summarize experience and lessons in the process of engineering project management in construction, construction management process need to be aware of some Suggestions, which has some reference value. But due to human factors, project one-time, not gay lead to some defects such as reason, so the evaluation is still not perfect place, remains to be further discussed.
Keywords/Search Tags:Shantytown rebuilding, Project Management, Evalution-Index, Multi-layer Fuzzy Synthetical
PDF Full Text Request
Related items