Font Size: a A A

Research On The Problems And Countermeasures Of Progress Management About Design Of Equipments In Styrene Project

Posted on:2017-01-22Degree:MasterType:Thesis
Country:ChinaCandidate:F Y PangFull Text:PDF
GTID:2311330533450793Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of economy in our country, the domestic demand for chemical products is growing. And the price of domestic chemical products is rising. The new chemical projects are founded by many enterprises for the profit. Domestic process technology is relatively backward. So the foreign process technology is introduced for the new chemical projects. The chemical equipments are the key parts of chemical project. The most important thing is the progress management in the design process. Completed in accordance with the requirements of schedule or completed in advance for equipment design is related to the whole process of chemical project.The text introduces the general situation of equipment of the project of the styrene. It also introduces the design process, the design team and design division. Finding out the problems in the design schedule management of chemical equipment. Including process package design standards are inconsistent with domestic, modifying process conditions, lack of designers, analyzing the reasons: lack of effective communication, project technical requirements change, less number of designers and personnel quality is uneven, putting forward: first, Constructing multi-channel communication mechanism to strengthen communication, followed by the need to strengthen condition censorship, respectively set up a professional engineer, professional designers and head of three-stage review, finally put forward the need to rational allocation of human resources, how to deal with personnel lack and measure about how to improve the personnel quality.This article discusses how to deal with some problems in equipment design progress management, and hoping this can contribute valuable reference to domestic chemical industry project.
Keywords/Search Tags:Chemical project, Equipment design, Progress management
PDF Full Text Request
Related items