Font Size: a A A

Research On Schedule Management Of Acid Mist Treatment Equipment Modification Project In Baosteel Special Metals Long Product Co.,Ltd

Posted on:2018-12-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y F HuangFull Text:PDF
GTID:2491306047953239Subject:Project management
Abstract/Summary:PDF Full Text Request
This essay is written based on project management and progress management basic thinking,the focus is to analyze the interact plan technology.From the project plan design,project progress optimization,project progress control and adjustment of project implementation,in order to have a detailed discussion of the progress management method of the project.This essay consolidates on acid mist treatment equipment modification project in Baosteel Special Metals Long Product Co.,Ltd in order to apply the theory of project management to the project.We will focus on the Schedule Management via the combination of theory and actual condition.From the plan of the project schedule to the application,Schedule optimization and control and then the adjustment of the project.In fact,it could be elaborated from three aspects:(1)Design of Progress Plan,Via analyzing the first hand data for proj ect.In order to ensure solid foundation,the aspect of duration,resources,project requirements is important as the critical factor.Using interact plan technology to design the initial marketing survey will be one of the aspect to consider.(2)Optimization of project schedule,adopt cost optimization to optimize the initial progress of the project,and further improve the reasonable project schedule(3)Control of Project Implementation,based on the progress situation to monitor and follow up,control the project implementation.Making proper alignment and renewal within the plan scope and the actual happenings.The purpose is to ensure completion of the project based on the planned requirements.This essay adopts methodologies from research on theories and practical implementation.At the same time,it refers to extracts both from domestic and overseas.Based on the present project theories and actual application development,making progress management theory applied to acid mist treatment equipment modification project in Baosteel Special Metals Long Product Co.,Ltd.It has good reference values in general to Baosteel Special Metals Long Product Co..Ltd and it will have a strong practical guiding significance in the progress of Baosteel Special Metals Long Product Co..Ltd’s project management and it has achieved good effect during the actual work.
Keywords/Search Tags:Equipment Modification, Progress plan, Progress optimization, Progress control, Critical Path
PDF Full Text Request
Related items