Guangxi Jiuzhou International Construction Project Quality Management Research

Posted on:2016-11-27Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhangFull Text:PDF
GTID:2322330485999823Subject:Project Management
Abstract/Summary:PDF Full Text Request
As China-asean free trade area is built, as the capital of guangxi nanning, the urban construction investment continues to grow, construction engineering project size bigger and bigger.Based on nanning city construction management enterprise management information system of the statistical data show that in 2015, the nanning construction engineering project under construction in 1820, in the construction administration department of registration for the record of 1350 in building engineering construction qualification of enterprise, in this calculation, each average in building construction qualification of the enterprise to undertake the project number less than 2, brought to the fierce competition in the field of construction engineering.Out of instinct to stimulate enterprise survival and development, and building construction unit to the project cost control, superposition of these two factors, make the most of construction enterprises in order to obtain project, in make full use of this principle on bidding winning a tender with reasonable low price, using the asymmetry of information, in the process of bidding to malicious competition in the process of project bidding.To bid, many construction enterprises tend to ignore the strength of enterprises, and the actual cost of construction project, to bargain, malicious bid, formed the bidding enterprise later in the project, in the process of construction for the pursuit of "profit", taking "to cut corners, shoddy construction thinking, buried a serious security hidden danger for the engineering quality.Taking jiuzhou international construction projects in guangxi as an example, this paper analyzes the present situation, the project construction management and using the method of shark fin figure factors that impact on the quality of the projects the recognition, finding sources, main factors affecting the quality of tall building diversified, quality hidden trouble;Using the Delphi method to the project engineering quality influence factors were evaluated, and determines the key factors affecting the engineering quality, project manager, commercial concrete, steel machinery, special technical scheme, the regulatory environment and measurement method, which requires excellent project managers to work smoothly, and in order to prevent the happening of the quality accident, must be optimized construction method and scientific analysis of the environment, strict management of materials, machinery, management and measurement management, the introduction of total quality management, set up perfect quality management system, to coordinate all the contractors and staff relations, unified the parties know, set up the concept of "quality is life", to eradicate habits of the construction industry, the model for quality management of the construction industry in China and reference, thus improving engineering quality, promote transformation and upgrading of the construction industry and development.
Keywords/Search Tags:Construction Engineering Project, The Project Quality Factors, Quality Management, Countermeasures and Suggestions
PDF Full Text Request
Related items