Font Size: a A A

The Research On The Power Grid Planning Of Ji'an New District

Posted on:2017-07-04Degree:MasterType:Thesis
Country:ChinaCandidate:C WangFull Text:PDF
GTID:2322330488488229Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
Economic construction, electric power firstly. The planning of power grid is one of the most important infrastructure for electric power enterprise development, and it also an important part of national economy and social development for a country.In order to plan and transform the reasonable power grid, on the one hand it can solve the contradiction between supply and demand of electric power and improve the power supply reliability and security of power system. On the other hand, it can avoid to wasting much money and resources in the greatest extent and promote the orderly development related industry to obtain enormous economic benefits and social benefits.South city distract as a new planning distract of Ji An city, the city government devote it to be a new municipal party committee and political culture central. In this paper, the present problems and development trend of power grid were analyzed objectively and accurately, the combination of South city distract function orientation, planning layout, population scale, industrial structure, etc., at the same time,the power load is forecasted.Based on all above,through the optimization of both horizontal and vertical combination of grid planning process, to obtain the power grid planning of south city distract and solve the problems of capacity of the power supply in new distract and so on, at the end, the investment estimate and effect analysis of the planning are carried out. The planning of new distract lead a solid foundation for the economic construction and social developments in the future construction, and realize the power grid planning and design scheme of modular, and it will get a better guide to region power grid construction and ensure the safety of power grid, reliable, economic operation. It also very useful to the facilitate transplantation and replication in other distracts.
Keywords/Search Tags:South city district of Ji An city, power load forecast, power gird planning, investment estimation
PDF Full Text Request
Related items