Font Size: a A A

Research And Application On The Electrical Risk Management Information System In Hohhot Railway Bureau

Posted on:2016-10-17Degree:MasterType:Thesis
Country:ChinaCandidate:Z X ZhouFull Text:PDF
GTID:2322330488987803Subject:Transportation engineering
Abstract/Summary:PDF Full Text Request
Along with our country economy high speed development, the demand of passenger and cargo transportation, railway transportation ability to become an important factor restricting the development of national economy, railway development and road network planning and construction, large span eased on railway channel capacity. Especially in the party's 16 big since, under the correct leadership of the CPC central committee and the state council, and obtained the rapid development of railway industry in China. At present, China has the world's first high-speed railway mileage, but because does not have a railway signal system conform to the requirements of the electricity system, has the characteristics of the electricity system management system, the electricity system has long low labor efficiency, affect the overall efficiency of transportation, it is on the communication system of electronic, information construction put forward new requirements.In this thesis mainly based on the production task of each link of railway bureau system and the weak link of limiting electricity system information problems, study the issue of railway electricity production task information system. Railway signal equipment is to organize the train operation command, to ensure driving safety and raise transportation efficiency, transfer information, improve the staff working conditions of the key facilities of driving. So as to meet the needs of railway high-speed development of the electricity system, studies the communication system of informatization construction has very important practical significance.Drawing the actual situation of the communication system, electricity system every link of the production tasks for the research analysis, and combining with the demand of development of Hohhot railway administration and the long-term development of the electricity system itself, the necessity of information called draw electricity system are analyzed. Shout and signal depot, for example, the electricity part of the system, signal part, communication part(wired and wireless), car parts based on the analysis of the research, based on safety management, construction management, production management module of research and development, effectively solve the problem of electricity production information system, to improve the ability of office, transportation efficiency and benefit has positive role and significance.
Keywords/Search Tags:Signal, Risk, Management, Information, Application
PDF Full Text Request
Related items