| In the management of the project progress, the establishment and optimization of the plan is the first link which plays an important role in the process of project management. Only work out a plan for the project which is realistic and workable, can we guide the actual work in the construction process, to ensure the rational allocation of resources and meet the requirement of the project. At present, the delay which exists in the project generally affects the realization of the contract duration goal as well as the economic profit. How to improve the planning level of the project schedule is an urgent problem to be solved in the project construction. Different from the ordinary construction project, resettlement housing project belongs to the projects that benefit the people. The livelihood issues are not small matters. The progress control of the project must be controlled strictly. So it is obviously important to work out the progress plan of the resettlement housing project.This paper selects the DCS resettlement housing project as an engineering example, through the combination of theory and practice, the project schedule is analyzed, compiled and optimized. First, consult the relevant literature, strengthen schedule theory from the theory level; secondly, a careful analysis is made on the formation of the schedule planning of a certain DCS housing project according to the theoretical studies, and gradually develop the initial construction schedule network diagram and then a Gantt chart; according to the schedule target, the time cost optimization method can affect the total duration of the work of compression, obtains the optimization plan cost savings, in order to achieve the project objectives, and to develop the optimized project schedule; finally, a full analysis is made to the safety measures of the project. They also sum up the relevant experience and predict the developing trend. Using the advanced management software, this paper systematically completes the DCS resettlement housing project schedule, including the preparation and optimization, according to the characteristics of resettlement housing and project management experience. It is sure to provide some reference for related engineering implementation of schedule management in the process of the work. |