Font Size: a A A

The Whole Process Of Construction Project Cost Management Control And Case Study

Posted on:2018-09-11Degree:MasterType:Thesis
Country:ChinaCandidate:Z H ChengFull Text:PDF
GTID:2322330515473951Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Construction units throughout the project cost and control the project proposal stage,the preliminary design stage,construction drawing design and budget stage,bidding and contract signing stage,construction stage,completion acceptance stage,etc.The whole project construction.For saving the cost of investment,improve investment returns,must to the whole process of project cost,comprehensive,effective management and control.Project cost management should be in accordance with social market average,effective and standard controls,saving construction investment and improve the economic benefit as the goal,the content of each stage contains very rich.This article is based on the perspective of the construction unit,from the perspective of macro and micro two launches the analysis research.In macro management to the project cost management related theory as a guide,combining with management experience in different stages of the investment management and the existing problems and summarized in this paper,the engineering cost management system,management process and related system and the method,analyzes the deficiency existing in the current management mode of engineering cost,probes into the whole process of project cost management.In micro management,based on the forefront of engineering cost management theory and the mechanism of the whole process control,with the examples of FT company summarizes FT companies at various stages of construction cost management,analyzes the existing problems,and in view of the problems,puts forward the feasible improvement measures and solutions,the company of engineering investment control level was improved,so that companies in various construction projects more reasonable input of human and material resources,financial resources,maximize the guarantee to achieve the goals of the management of construction project investment,to maximize the benefit of investment.In a word,the engineering construction project scale,investment big,large quantities,construction time and engineering complex,it is easy to cause the construction unit of unnecessary waste and loss.Through the analysis of this article research,to explore more reasonable and effective scheme of controlling engineering investment,strengthen the investment control of the project,make the company get the maximum benefit of investment.
Keywords/Search Tags:construction unit, management control, standardization, case study
PDF Full Text Request
Related items