Analysis Of Risk Assessment And Management Measures For Building Engineering Project

Posted on:2018-08-21Degree:MasterType:Thesis
Country:ChinaCandidate:L LouFull Text:PDF
GTID:2322330515479218Subject:Engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of national economy in our country,the construction project is present a steady growth trend all over the country.Architectural engineering project has the characteristics of large investment,long construction cycle,much influence factors,risk uncertainty,etc.The characteristics will lead to the construction management of construction project risk can not to control project risk as soon as possible;After the accident of risk,the construction management of construction project risk can not to make accurate decision,the construction design and construction of risk prediction and prevention of setting scheme in time,the result will cause casualties,project goals cannot achieve,and so on and so forth.At the same time in the process of construction also can see many unknown factors.If we are not good at deal with in time,the factor will give the owner,contractor and so on various parties,bring serious loss.On the basis of construction engineering project,management of risk prevention measures is very necessary.In this article,firstly,introduced the background and meaning of this construction project risk management,summary the concept of architectural engineering project risk,characteristics,reasons and types in detail in this paper.Tells the story of the cause of the risk management and basis.Secondly,introduces several kinds of commonly used construction project risk identification method,the fuzzy analytic hierarchy process and expert scoring method is mainly used in architectural engineering project risk analysis,combining qualitative analysis with quantitative analysis.thirdly,the architectural engineering project risk prevention and measures of preventing made important instructions,using the financial countermeasures to control risk,including project insurance and project guarantee method makes the project risk can be reasonable and effective transfer to a third party.Made a negative risk or hazard risk coping strategies and the positive coping strategies to avoid the happening of the risk.Finally,in this paper,the authors used own many years experience of working in real estate development company to analyze the actual case example.The method of analysis in the process of investigation,expert evaluation method was used to study.Construction project risk can be divided into six categories.Offer reasonable and effective prevention methods for every type of aversion,and hopes to explore a set of suitable for China's current construction project with effective control of risk management measures.The measures can make construction management personnel quickly improve higher risk management knowledge and effective control the risk of management,understand the role of risk prevention to master the knowledge of the risk to prevent and deal with and resolve.
Keywords/Search Tags:Construction Projects, Risk Identification, Risk Analysis, Financial Measures
PDF Full Text Request
Related items