| Equipment supervision is an important part to ensure the quality of equipment.To accomplish the new rural construction tasks and ensure the quality of amorphous alloy transformer,Henan Power Company decided to carry out the equipment supervision to the 26,813 amorphous alloy transformers in the engineering.At the same time,the supervision to the installation and commissioning phase of the distribution network is implemented to ensure that the amorphous alloy transformer plays an important role in the distribution network project.In this paper,the study of energy saving of amorphous alloy materials and its application in distribution transformer makes the advantages of amorphous alloy transformer are fully understood.The analysis of amorphous alloy transformer investment benefit is focused on by several county companies’ actual operation parameters.The application of equipment supervision theory method plays a guiding role in Henan Power Company distribution network engineering investment and provides strong theoretical basis for the complete application of amorphous alloy transformer in distribution network engineering.Henan Province “Four Measures” in line with Henan Province actual situation was laid down by the control to the key links of the distribution network engineering installation,commissioning stage and according to the construction process of the safety,quality,schedule management,“Henan Province Distribution Network Engineering Construction Supervision Implementation Details” was completed to protect safety,quality,schedule of the network engineering construction.“The 20 k V and below Power Distribution Network Engineering Drawing Calculation Software” was developed successfully and was applied in the whole Henan province power distribution network construction,which makes amorphous alloy transformer application more convenient and good results have been achieved.It has been widely praised by the State Grid Corporation.The specific contents are as follows:1.Research the indicators in the distribution network and confirm whether the amorphous alloy transformer can be widely used in distribution network engineering according to its practical application and operation in a few county power companies.After the energy-saving and emission reduction effect of amorphous alloy transformer,through detailed calculation using amorphous alloy transformer how many years can recover costs,guide the provincial company of distribution network engineering equipment selection,plans to invest adjustment provides powerful basis.The analysis of the non-crystal alloy transformer investment benefits is focused on by the actual operation of several county companies’ related parameters.Using the method of equipment supervision theory,the investment of distribution network project of Henan company plays a guiding role.2.With the increasing investment scale of distribution network project,the construction of distribution network is becoming more and more heavy,which is difficult to improve the quality of the distribution network and to prevent the risk of the site security.In order to strengthen the distribution network project site organization and management,the implementation of the national development and Reform Commission the power construction engineering construction safety supervision and management measures "and the State Grid Corporation of distribution network engineering security,technology management requirements,combined with the actual situation of distribution network projects over a broad area,and the construction period is short,the reunification of the province company and standardize the distribution network construction plan,formulated in line with the actual situation of Henan Province Distribution Network Engineering" four measures case ",including organizational measures,technical measures,safety measures,civilized construction and environmental protection measures and emergency disposal plan.3.Through the application of amorphous alloy transformer and installation and debugging process of supervision technology research,combined with national power company power grid construction supervision related provisions,formulate the national network of Henan Province distribution network engineering construction supervision rules ".Effectively guide the distribution network construction,strengthen the Henan Province distribution network construction and transformation project supervision work,standardized supervision,improve the level of supervision service,guarantee the successful completion of network engineering tasks,give full play to the investment benefit.4.To strengthen the "three links"(universal design,general equipment,general cost,standard process)specification of upgrading rural 10 k V and below the project preliminary design work,deepening the standard generalization of the typical design and specification ERP rural power project materials submitted to the management process,high agricultural network project management standards and working efficiency,simplify the working procedure,combined with the characteristics of electric power engineering,needs a set of mature and perfect design,budget,and ERP material management as one of the intelligent,efficiency,popularity of software system.Developed the 20 k V and below power distribution network engineering drawing calculation software,and improve the subsequent distribution network of 10 k V and below engineering preliminary design work efficiency,and ERP of engineering equipment and materials submitted to the accuracy and of 18 cities in the province,107 counties under the jurisdiction of the regional distribution network engineering design work has a great role in guiding. |