Font Size: a A A

Optimization Of Calt Components Independent Security System

Posted on:2018-12-13Degree:MasterType:Thesis
Country:ChinaCandidate:Y F ZhaoFull Text:PDF
GTID:2322330533468851Subject:Project management
Abstract/Summary:PDF Full Text Request
With the development of China's aerospace industry,in order to solve the embargo,shutdown and other engineering risk CALT models brought about by the use of imported components,through the CALT independent security system components and model components of the domestic hospital.The components of independent security system can not meet the needs of the rapid development of aerospace enterprises,independent guarantee in the running process of the system reveals many problems,which restrict the development of independent components CALT guarantee ability.In this paper,by using the method of analysis of current hospital components independent security system operation by fishbone analysis of independent security components appear in the project development management,application management and application management in three stages of system analysis,through the introduction of advanced PM management mode to optimize hospital components independent security system,put forward the new management mode from the three stage of the independent guarantee system to solve the current problem of independent guarantee system,and the specific safeguard measures are put forward from the independent guarantee system of organization management,standard management,operation management and risk management four aspects,to ensure the smooth implementation of independent guarantee system improvement scheme,improve the security system of the independent components of CALT target.The main contents of the paper include several aspects:(1)In view of the current situation of traditional hospital components CALT independent security management mode and system development,through the introduction of PM management model to enhance the professional independent guarantee system,and the international aerospace power,power components independent security management standards.(2)For a research,research division of R & D management mode,put forward the "components system","multi research" and "research cooperation" research and development management,solve the R & D management components in the status of supply capacity and supply insufficient research unitprice does not break.(3)For the use of mature design application management,put forward the "wide precision instrument," directory management,supplier management and "grading out" "linkage design" application management,solve the model components were more and more huge application status and application of closed-end management thinking,stimulate the hospital system design innovation model thinking,to promote the design and development of application system model components of hospital.(4)According to the "one by one" application management,put forward the "one thing one","hierarchical verification" and "comparison" application management,application verification becomes more and more heavy,the status of more and more high cost.
Keywords/Search Tags:imported components, localization, independent guarantee, application verification management
PDF Full Text Request
Related items