Common Problems In Highway Construction Management And Analysis Of The Corresponding Plan

Posted on:2017-03-06Degree:MasterType:Thesis
Country:ChinaCandidate:Y LiuFull Text:PDF
GTID:2322330533950089Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
In the background of the rapid development of China's economic and social construction, China's highway construction, especially the freeway construction is closely keeping up with the pace economic development and has made a leap forward development. No matter from the mileage and quantity, the highway has been greatly improved. The rapid development of the highway at the same time,A lot of problems have appeared in the Key period of construction of the expressway. These problems mainly concentrated in the process in the management of highway such as construction project quality, schedule, cost, safety, environmental protection and other elements.These factors restrict and influence with each other and could not play a better promotion effect. There is the T10 contract section(YK34+505, ZK34+523 to K42+226.419) between BanBa to JiangDi freeway in Guizhou Province. The main line of a total length is 7.721 kilometers and Anlong interworking connection line 7.7 km including roadbed, bridges, culverts, tunnels, protection and drainage.Based on the summary of BanJiang freeway T10 contract section,s commom construction problems, A number of thorough investigation, research, program selection were done. Finally, the following solutions were proposed to guarantee the successful completion of construction and following results were achieved.First, cost guarantee system and security assurance system are established and strengthened. Measurement and payment clearance are strictly controlled. Further,effectively control the subcontract project cost. At the same time, strengthen publicity,increase investment in safety management, develop contingency plans;Second, in the project progress, according to the actual situation of the project,through the horizontal road map, network diagram and other scientific means, make progress plan, finally,determine the optimal scheme; at the same time, practical measures are put forward;Third, enhance the awareness of quality management, implementation and management quality of clear responsibility, apply scientific quality control method to control the quality, implement the quality to each responsibility person; optimize the schedule;Fourth, The ecological and environmental protection measures are formulated, and the environmental monitoring is brought into the category of construction management;Through the implementation of the BanJiang freeway, the construction management of similar projects in the future has a certain guiding significance and reference value.
Keywords/Search Tags:highway, construction management, quality management, schedule management
PDF Full Text Request
Related items