Font Size: a A A

Study On Tieshang Gang Industrial Park Of Beihai Water Supply Engineering

Posted on:2018-01-02Degree:MasterType:Thesis
Country:ChinaCandidate:G K FanFull Text:PDF
GTID:2322330542483626Subject:Engineering
Abstract/Summary:PDF Full Text Request
Post project evaluation is completed or comprehensive systems analyses of end item,through the track analysis of the project after the completion of the operation,and thereby to the project's success or failure,advantages and disadvantages,pros and cons to draw objective conclusions to help investors raise the level of decision-making and management of the project,the next step for the project construction provide a meaningful reference.Rapid development of the domestic infrastructure investment,the phenomena of successive projects and highlight the importance of post project evaluation.But theoretical research method of post project evaluation in our country is still comparatively old and new theoretical method has no integration with the evaluation system in a timely manner,can not meet the needs of the new situation.Tieshang Gang industrial park of Beihai water supply engineering is a key construction project in Beihai city,in Tieshang Gang industrial park,Beihai city,and even the entire socio-economic development is of great significance.Tieshang Gang industrial park of Beihai water supply engineering in this paper using a variety of methods from multiple perspectives the project evaluation.In addition to the logical framework method and benefit-cost analysis,the two commonly used methods,also tried to use BSC(the Balanced Scorecard)to post evaluation of the project.In the paper,the basic idea of the BSC model,and the adjustment for post project evaluation is expounded in detail.development of post project evaluation study provides a new way of thinking.
Keywords/Search Tags:Tieshang Gang, water supply engineering, Project Post Evaluation, BSC(the Balanced Scorecard)
PDF Full Text Request
Related items