Study On Risk Management Of Urban Gas Pipeline Network Project Acquisition

Posted on:2018-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:X LiFull Text:PDF
GTID:2322330542964556Subject:Project Management
Abstract/Summary:PDF Full Text Request
Natural gas is a kind of high quality,high efficiency,low carbon clean energy,with the national development and Reform Commission on natural gas demand in 13th Five-Year development plan of the whole,natural gas will serve as the next period of time the city residents,commercial,one of the main applications of energy industrial users.The development of natural gas industry will develop faster and better in "13th Five-Year" period,natural gas project has become a kind of high-quality assets,by domestic and foreign capital giants attention,including Huarun domestic gas,Hong Kong and China gas,fuel,Xinao Gas and some listed gas enterprises on the domestic natural gas station,city gas pipelines,liquefied natural gas receiving station project The investment and acquisition.As the local government like a raging fire on the gas management needs of licensing and regional restrictions,this resulted in the process of project acquisition,there is a big risk,and there are many uncertainties,the problems and characteristics of natural gas projects through acquisitions,provide more risk management measures natural gas pipeline gas project in future similar acquisition,and effective method.Study on the risk management of similar,more effective method is case analysis,taking the LJN natural gas pipeline gas acquisition project as an example,in accordance with the method of qualitative analysis and summary of practical experience,to the acquirer’s perspective,should establish a set of city natural gas pipeline network project acquisition risk management system,this system should have general applicability,and has a system.In this paper,through different risk characteristics of city gas pipeline gas project summary of the acquisition process,different working stages with the actual project of the acquisition process,each ring of LJN natural gas pipeline gas acquisition project In the section,through scientific methods including risk identification,sorting out the complete list of project risk.Then using the Delphy method,the risk probability of the existence of LJN city natural gas pipeline gas project,effective assessment and risk effect;then using another method,namely the risk matrix analysis,reasonable determination each of the size of the existing risk acquisition project,reasonable evaluation of different levels of risk,sorting out the LJN natural gas pipeline gas acquisition project risk assessment form;through the above methods and measures,finally clear the LJN natural gas pipeline network and gas acquisition project.Finally,there are significant risk from LJN A major risk assessment of natural gas pipeline gas project,reasonably determine the risk prevention,risk avoidance,risk mitigation and risk retention of several risk measures,can from the above several countermeasures,countermeasures for optimal assessment that measures,summed up the operability,specific risk response and control measures in detail.
Keywords/Search Tags:natural gas pipeline network, gas risk management, risk countermeasures
PDF Full Text Request
Related items