The Construction Organization Design Of Continued Construction And Water-saving Recon Struction Project Of Changge Irrigation District In Suileng County

Posted on:2016-03-22Degree:MasterType:Thesis
Country:ChinaCandidate:B C FuFull Text:PDF
GTID:2323330482953372Subject:Project management
Abstract/Summary:PDF Full Text Request
To our country engineering construction enterprise consolidation analysis found that the enterprise is originated in the planned economy system in our country and the background of the engineering construction enterprise of our country in the construction design, organization and implementation of specific process, failed to arouse sufficient attention. The management of building construction industry is becoming more and more important, the management system reform is gradually deepened, and the management of construction projects is particularly important. The level of this work reflects the strength of construction enterprises, and the important factors that affect their survival and development. Construction organization design is a kind of normative document, which is essential in the basic construction of our country. The technical document, in our country the first five years of the plan that has a clear specification, and the document for some of our industrial construction projects, has played a very positive role, prompting the construction organization design system more standardized. Construction organization design is the concrete planning and design of project management. The content of the design is detailed planning and design of the various links in the construction. All the factors affecting the construction should be considered comprehensively. The construction organization design is to analyze and discuss the complex engineering construction process, based on the premise of ensuring the smooth completion of the project, the research on how to organize and plan an engineering project. The research process needs a comprehensive and detailed analysis of the construction process, involving the construction of specific planning, construction organization arrangement, how to carry out the coordination of different departments, progress control, and strive to achieve high performance, optimize the production factors, such as various departments, different types of labor, construction materials, construction machinery, concrete construction procedures, etc.. In principle, the construction organization design in order to ensure the construction quality, construction safety under the premise, the requirement can maximize the use of building resources, in the premise of reasonable investment, ensure the high return, and to ensure that the progress of the whole construction project. Therefore, the construction organization design is scientific and standard for engineering construction plays a key role, it is necessary to explore the construction organization design, in order to explore more scientific and reasonable organization design scheme, and to coordinate and guide the construction, this is very necessary for the construction.This study based on the actual case of the construction project, from the specific situation analysis, from the geographical position, climate, historical transformation, engineering quantity and function, hydrological and environmental contract project and other aspects of this project, decomposition of various engineering parts, the construction plan of detailed design and analysis, combined with the basic theoretical knowledge, the progress of the relevant control, based on the project management, from the project preparation stage, has been continued until the project is completed, develop detailed planning.The concrete use of the cross road map and the network diagram to express and analyze the progress of the progress, and to ensure the precise implementation of the progress of the implementation and the implementation of the specific guidance measures. To ensure the quality and safety of construction, the strict rules and regulations of the organization and access technology are proposed. The key points of the engineering construction characteristics, difficulties and countermeasures are put forward. According to the actual situation of the project, the construction schedule is put forward. According to the actual situation, the construction schedule, construction technology, quality assurance and safety assurance are put forward.
Keywords/Search Tags:project management, quality, schedule, cost, planning
PDF Full Text Request
Related items