Research On Owners' Management Scheme Of A Second Phase Of Water Conservancy Irrigation Engineering

Posted on:2018-05-31Degree:MasterType:Thesis
Country:ChinaCandidate:Z X LaiFull Text:PDF
GTID:2323330518461650Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
Project management according to the nature and characteristics of the participation of all parties to work can be divided into owner project management,design project management,construction project management,the project management and project construction contractor project management etc..The owner is the total integration of the production process of building project of the integration of human resources,material resources and knowledge,the owner side is also general organization construction project of the production process,so for a construction project,although the project management,representatives of different stakeholders but the owner project management management the core.However,in the domestic construction market,most projects attach importance to the construction side,while ignoring the owner of the project management,the owner failed to really participate in the project construction process,the project organization,coordination and management failed to play an effective role.In order to ensure the realization of the goal of the project,we must pay attention to the owner's project management,the use of scientific and effective management methods to control the project investment objectives,progress objectives,quality objectives.Therefore,it is of great significance to study and analyze the management of the project owner.A water conservancy irrigation project is a national key construction project,the irrigation area is completed,will greatly improve the irrigation conditions for agricultural production,improve irrigation rate,increase the income of local farmers,has the vital significance to the implementation of national food security strategy.At the same time,to provide water security for the county of Linchuan District,high tech Zone,Dongxiang County,Jinxi County,the economic and social development,to meet the regional water demand,alleviate rural water disputes,is conducive to the promotion of local social stability.In order to ensure the smooth implementation of the project,the owners need to carry out the initial study,and on this basis to form a complete project management plan for the owners.In view of the first phase of A irrigation project has been completed and acceptance,the two phase of the main construction content and scale of construction has been approved,so this paper mainly studies the A irrigation district irrigation project owners of the two phase of the project management.First,describes the research background,the significance of project management at home and abroad,especially the research status of owners and management of the water conservancy project,introduces the goals,ideas and methods of this study;secondly,an overview of A water conservancy irrigation two general situation of the project and the participation of the party's organizational structure and job responsibilities;finally,focus on A water conservancy irrigation area of the two phase of the project owner in the design preparation stage,design stage and construction stage of managementfocus,and some key attention for system analysis.Through this study,the following conclusions:1.Engineering design stage and design stage,focus on the owner of the project management is feasible and scientific in the process of design management;construction stage,2 key project,the owner of the project management is the effective control of the construction process,construction quality and investment expenditure the duration of the three major objectives of the key;3,engineering bidding is bidding project;4,construction land acquisition and resettlement of the focus is to do the owner of land expropriation and housing expropriation and resettlement planning and investment management;5 key project procurement work,the owner of the project management is to develop and implement procurement planning the task;6,the project management is the construction of environmental protection supervision and inspection mechanisms for the development of environmental protection,to prevent the construction of the environment Harm.
Keywords/Search Tags:construction market, owners, project management
PDF Full Text Request
Related items