Font Size: a A A

Research On The Model Of Project Group Resource Allocation In A Hydraulic Machinery Plant

Posted on:2017-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:W H WangFull Text:PDF
GTID:2349330488487441Subject:Business administration
Abstract/Summary:PDF Full Text Request
At all times and in all countries,project management practice has existed in all walks of life.But with the gradual deepening of the continuous development of science and technology,project management theory research and refinement,the enterprise scale and gradually expand,people began to realize that project management mode of the traditional vertical type economic model and single project operation cannot meet the demand of the new situation of social and economic development in today's world.Project management system provides managers with scientific management tools and advanced management concepts,but also the project managers put forward more and higher requirements.For example: how to make the enterprise the goal of strategic management and the management targets of project in the United up and realize the benefit maximization,how to make project management implementation single project management concepts to the project group management idea transformation,how to realize the project group the rational allocation of resources so as to realize the benefit maximization and so on.This has prompted many countries to engage in project management research workers and practitioners will be more time and energy into the project management.Along with the gradual deepening of research and practice,people found to affect a project group management effect factors include the following aspects: the division of functional departments is not clear,poor project group incorrect classification,information circulation channels,project target group and the strategic objectives of enterprises are not unified,irrational allocation of resources,management system is not perfect,project manager or management personnel ability is poor,national policies or other factors influence and so on.Under the combined effect of these factors,the focus of the work of the project group management is through building quality project management team,establish strict financial management system,cost accounting system and process control system,unified under the premise of the strategic objectives of the enterprise resource allocation scheme in the establishment of and above all measures and in the process of programme management,meet the needs of the project between about various aspects of human resources,time,money,equipment,raw materials and other competing needs,so as to achieve implementation of project management goal of maximizing the interests of.Manufacturing industry as a pillar industry of the national economy,highlighting the country's creativity,competitiveness and comprehensive strength.Hydraulic machinery manufacturing industry as a basic industry,the people's livelihood,in the governance process of the river plays an irreplaceable role,its development also represents the governance of our rivers and the use of advanced and creative.After a long period of development and reform,hydraulic machinery manufacturing enterprises gradually adapt to the operation mode under the market economy system,and the project management system is adopted in the process of hydraulic machinery manufacturing.With the popularization of the concept and method of modern project management,the project management level of enterprises has become an important indicator of the core competitiveness.This paper is in such a background,through the study of relevant literature,understand relevant project group,programme management and project group resource allocation problem theory,find the ways and methods to solve project group of resource allocation problems.Before two chapters as the theoretical basis by analysis and research of a state-owned water engineering machinery plant A project group of the allocation of resources,define the project group management,establish project group management organization structure model and project priority expert evaluation meeting system,feedback mechanism as the main content of the process mechanism model.Application of AHP and other mathematical methods establish mathematical model for resource configuration,and solved,reached the final project priority weight vectors,this as the basis that project A group in the project plan for F resource supply and demand.Finally,the rationality and superiority of the above model in the process of resource allocation of the hydraulic machinery plant are summarized and prospected.
Keywords/Search Tags:A hydraulic machinery plant, Project management, Resource allocation, Analytic hierarchy process
PDF Full Text Request
Related items