Font Size: a A A

VFM Evaluation Research On Subway PPP Projects Based On Fuzzy Comprehensive Evaluation

Posted on:2017-04-25Degree:MasterType:Thesis
Country:ChinaCandidate:J Y ZengFull Text:PDF
GTID:2349330512960901Subject:Business administration
Abstract/Summary:PDF Full Text Request
To solve the public utilities in our country development is conditioned by financial fund shortage problem, the government department to seek the introduction of the method and the way of social capital. PPP (Public Private Partnership, the government and social capital cooperation) model is the world's recognized can effectively solve the a good way for project funding gap, promote the application of the PPP mode, to speed up the transformation of government functions and help to set up a modern system and promote the healthy development of urbanization. Determines whether a project will adopt PPP construction should pass VFM evaluation, but at present our country about the VFM evaluation experience and theoretical research is still in its infancy, there are a lot of problems to be solved.The purpose of this paper is to solve the current our country the PPP project VFM evaluation subjectivity problem is relatively serious problem, in combination with the existing evaluation framework on the basis of a concrete feasible qualitative evaluation method is put forward. In reference to a large number of literature at home and abroad, summarizes the related concepts of VFM and two kinds of qualitative and quantitative evaluation method, emphatically analyzes the significance of VFM evaluation, current situation and existing problems. In view of the present VFM evaluation is too subjective, and the problems of poor accuracy, the innovation lies in combining with its theoretical basis, on the basis of the existing evaluation framework, the theory of AHP method and fuzzy comprehensive evaluation method, combining the advantages of two methods of decision-making, build the AHP and fuzzy comprehensive evaluation method and applied to the PPP project VFM evaluation, and expounds its principle and steps, to achieve the purpose of perfecting the current VFM evaluation method. Influence the VFM evaluation indicators to identify the level of the PPP project, and based on the AHP method to establish the target layer and index layer and the factors of the class hierarchy model, at the same time the weight of each indicator elements are oPPPained. Reuse model combined with the expert scoring method to calculate each layer fuzzy comprehensive evaluation of the level, to ensure our target layer of the PPP project VFM evaluation total level. In C city metro line 18 as a engineering example for the empirical research, oPPPained its VFM level is good, and the final result by validation, prove that the project is suitable for using PPP model construction, thesis research conclusion is consistent with actual. Visible AHP and fuzzy comprehensive evaluation method for the current VFM evaluation provides a workable method, reduce the subjectivity of evaluation framework, and improve the accuracy of the evaluation results.
Keywords/Search Tags:Public-Private-Partnership, VFM, AHP-Fuzzy, Comprehensive Evolution, Qualitative Evaluation
PDF Full Text Request
Related items