Font Size: a A A

Feasibility Study On The Airport Connecting Line And Station Supporting Project Of Kunming East Branch Of China-Myanmar Natural Gas

Posted on:2017-07-03Degree:MasterType:Thesis
Country:ChinaCandidate:X X FanFull Text:PDF
GTID:2351330482499380Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of the world economy, energy is increasingly becoming the lifeblood of a country's industrial development. Consumption of coal, oil and other conventional energy due to the constraints of environmental protection requirements are reduced, natural gas as a clean energy is gradually emerging people's attention, this paper studied project is to promote the natural gas industry development in the city.Feasibility study as a scientific method, which is now widely used in all aspects.it relies on the technical feasibility and economic rationality of investment projects carried out a comprehensive, systematic, comprehensive evaluation, so that decision-makers to make scientific decisions, reduce investment risk, ensure the accuracy of project decisions.In this paper, the China-Burma gas feasibility study Kunming East regional airport contacted by line and ancillary station project was discussed as an example, the first research background and significance briefly introduced, and then the feasibility study related theories, pointing out The basic concept, development status, content features and functions of the feasibility study, once again China-Burma gas Kunming East regional airport contacted by line and ancillary station project as an example combining supply and demand analysis, industry competitive analysis, price trends and their needs change make a prediction; and combining Kunming city gas pipeline development plan and the existing gas pipeline station construction to determine the scale of construction projects and programs, fire and projects, energy saving, environmental protection and security to do a special analysis, the corresponding countermeasures; and finally from the static, dynamic and uncertain three aspects of the financial evaluation, in addition, the paper also carried the risk of the project and social analysis, and proposed measures to prevent and reduce risk. Construction of gas pipeline feasibility study method established in this paper, the construction of the gas pipeline project from the market, building programs, financial, social aspects do a comprehensive analysis of the results of the study will help promote the development of natural gas in the urban transport industry, reduce urban air pollution, natural gas utilities to provide some guidance in the development of our city.In summary, this paper argues Kunming East China-Burma gas line and supporting regional airport contacted station project is feasible, and the project implementation schedule is given.
Keywords/Search Tags:natural gas pipeline, station, facilities, feasibility studies
PDF Full Text Request
Related items