| In the process of project construction,the delay period,cost overrun,poor quality,low investment efficiency or even no benefit of a certain proportion of the project,many projects completed and put into production,is the date of loss.One of the reasons is that there is no scientific evaluation and evaluation of the project’s benefits in the pre-project preparation phase.In order to assess and evaluate the investment benefits of the project,it is necessary to start with a comprehensive forecast of the investment in the project.In 2015,the total investment in fixed assets in Jilin City reached 260.95 billion yuan.Investment projects cover almost all important areas such as infrastructure,environmental protection and transportation energy.The number of projects,the amount of investment,the diversification of funds and the complexity of management Sex is much more than ever.Jilin City Metallurgical Industry Innovation and Development Demonstration Park project is one of the major projects during the "13th Five-Year Plan" period in Jilin City.The planned total investment is 6.38 billion yuan.Due to the irreversible nature of the project,it is difficult to reverse the project after implementation.Resulting in significant economic losses,but also damage the interests of society and the interests of the state.Accurate forecasting costs play an important role in saving state investment and improving the efficiency of infrastructure investment.To this end,we in the early assessment of the project in addition to taking into account the interests of the country must also take into account the interests of other investment parties,how to use the normal method of accurate project evaluation,to provide useful decision-making basis for investment parties is very important of.This paper mainly uses the method of theoretical analysis and case analysis to write a paper to clarify the various ways,contents and risks of the environmental relocation project,put forward preventive measures to the possible risks and problems,and draw the investment of the project Benefit evaluation conclusion and project feasibility.This paper is divided into six chapters.The first chapter is the introduction,which mainly elaborates the background and significance of the topic research,and introduces the theoretical basis and method of project investment benefit evaluation.The second chapter is the progress of the project demonstration and development of the metallurgical industry in Jilin Province.It mainly introduces the basic situation of the project unit,the necessity of the project construction and the progress of the project,so as to pave the way for the follow-up research.The third chapter is the project investment evaluation of JilinMetallurgical Industry Innovation and Development Demonstration Zone,which mainly introduces the project cost,capital structure,product profit and effectiveness,and has a preliminary evaluation of the economic benefit of the project.The fourth chapter is the evaluation of the environmental benefit of the project demonstration and development of the metallurgical industry in Jilin Province.It mainly evaluates the project from the aspects of energy saving and environmental protection,and draws a conclusion on the environmental benefits of the project.The fifth chapter is the evaluation of the project social benefit evaluation of Jilin Province metallurgical industry innovation and development demonstration project.It mainly analyzes the social stability risk index,measures the risk index of the project,and puts forward the measures and methods of risk prevention.Chapter 6 is the conclusion and prospect.Through the above research,the feasibility and risk of judging the project are analyzed,and the scientific rationalization proposal is put forward to ensure the smooth implementation of the project. |