Font Size: a A A

Study On Project Procedure Of WY Expressway Construction Project Owner Reception

Posted on:2017-02-11Degree:MasterType:Thesis
Country:ChinaCandidate:Z H ZhuFull Text:PDF
GTID:2352330512963992Subject:Project management
Abstract/Summary:PDF Full Text Request
Reception is WY highway construction headquarters that owner is an important part of the daily work of the construction of a project, the owner of a large part of the work lies in the positive communication, effectively coordinate the relationship between the project stakeholders cooperated-builing parties and interests, the reception is one of the owners have been the focus of the party, in a way that headquarters receive the quality of the work directly related and reflect the image of foreign owner party, even is related to engineering construction center works carried out smoothly and, therefore, this paper closely around WY highway construction project owner party reception process launches the research work.First, System is studied based on WY project owner side reception process, and its owner party reception in detail in this paper, the project process. First, this paper briefly introduces the WY project owner party receives the goals of the project management and organization; WY project owner party reception process were analyzed, including WY project milestone plan, structure analysis of the work, and expounds the WY project owner party host content and processes; And then analyzes the WY project owner party reception control process, including the reception of the scope of the project to verify and control, project schedule control, project cost control and supervision and inspection and rectification; Based on the WY project owner party reception process, analyzes its existing problems, including the receiving system is imperfect, fine management, reception management system is not sound and relatively insufficient reception management informationization level is not high.Second, to the owners reception process design of the project. Detailed analysis and design the owner party receiving project process, including drawing up reception scheme business processes, reception preparation business process, receives the business process, receiving inventory accounting business process, query cost at the business process and set up reception standard business process; Reception for the owner side risk identification, assessment and control of project management, and expounds the risk identification, assessment and control process.Finally, in yunnan province transportation hall held in WY project production scheduling advance will reception site as an example, through the owner party reception process research results available in the reception work, specific to the owner receives the elements in different stages of the project management should be carefully study, as a project management to do the reception work, implementation process, procedural and fine management. In determining the overall goals, formulate work plan, production service guide and meeting guidelines, organizing leading institutions, to receive the project schedule plan, allocate resources plan, the collection costs smooth realization transportation hall production dispatch meetings held in the highway construction, and finally let the reception of all stakeholders to achieve satisfying effect.
Keywords/Search Tags:hospitality management, project risk management, reception process, owner party
PDF Full Text Request
Related items