Research On PPP Of Agricultural Infrastructure Construction

Posted on:2017-08-30Degree:MasterType:Thesis
Country:ChinaCandidate:S Y LiFull Text:PDF
GTID:2359330512966712Subject:Agricultural extension
Abstract/Summary:PDF Full Text Request
Agricultural infrastructure plays an important role in the economic system of agriculture in China. With the rapid development of economic and social, the shortage of our agricultural infrastructure, become more prominent. The old agricultural infrastructure has been unable to meet the needs of modern agricultural, and even seriously hindered the development of agricultural economy. In order to alleviate the situation, we are forced to develop agricultural infrastructure.However, because of the source of agricultural infrastructure funding is alone; relies on the national fiscal and debt capital mainly. The high cost of agricultural infrastructure construction resulting in the supply and demand become more prominent, and huge funding gap become an obstacle to agricultural development difficult in.China. Our country has a high national savings rate. According to the statistics, the household savings reached 48.52613 trillion RMB in China by the end of 2015. If the sufficient private capital to take part in the agricultural infrastructure projects, the problem of insufficient funds will be able to give a good relieve. And then, the use of the PPP model can achieve the convergence of private capital and agricultural infrastructure. The PPP mode refers to a partnership between the public and private sectors for the provision of public goods and services established. The PPP model is not only a new concept, in addition to the introduction of private capital into the field of agricultural infrastructure in our country. But also introduced advanced technology and scientific management to improve operational efficiency and operational quality of agricultural infrastructure, and improve the utilization of resource. The field of agricultural infrastructure has a broad application prospects. The key of the PPP model in agricultural infrastructure is cooperation between the public sector and the private sector. The core of PPP model is a reasonable risk-sharing mechanism. Only during the effective risk allocation, the PPP model in the field of agricultural infrastructure in order to get a good application development effectiveness.This paper is divided into five parts, each part of the contents include:Part ?:Introduction. Introduce the background, significance, status, research ideas and framework of this paper.Part ?:Basic concepts and theoretical basis. Including PPP mode meaning, characteristics and classification of PPP model, as well as the operation of ideas PPP model and applied to agricultural infrastructure theoretical basis.Part ?:The PPP Mode in agricultural infrastructure SWOT analysis. Firstly, the three aspects including the allocation mechanism, the spirit of contract, and the private company of our agricultural infrastructure and the introduction of PPP model advantages. Secondly, from the needs of the market, private capital, policy support and learn from experience to start our analysis of the construction of agricultural infrastructure need to introduce the PPP model opportunities. Finally, from the private sector into the will of the parties into government priorities and challenges of the factors analyzed three aspects of the construction of agricultural infrastructure need to introduce the PPP model.Part ?:From the existing agricultural infrastructure, expansion or renovation of agricultural infrastructure and new infrastructure are three different types of agriculture to start analyzing different building. From the management efficiency of agricultural infrastructure, agricultural infrastructure supply and financing of three aspects of the current the PPP model application achievements, and pointed out the problem of the status quo of China's agricultural infrastructure PPP model development.Part ?:First, from the success of the PPP model, this paper introduces Pengshui County Phoenix liter reservoir engineering PPP projects. Firstly, introduce the Pengshui Phoenix liter reservoir engineering background to use the PPP model and the reality of the problems encountered. Secondly, from the solution, solutions, resolution mechanisms and border demarcation four-pronged analysis of specific situations the PPP mode applications. Finally, from the lessons of the failure of the PPP model, this paper introduces the construction and operation of PPP Jishou City Village Leisure agricultural Industrial PPP projects, analyze and summarize the reasons and the experience provided by the project failed.Part ?:Introduce incentives suggestions and opinions agricultural infrastructure the PPP model. First, we must improve the PPP model used in the legal system of agricultural infrastructure. Second, we must transform government functions, strengthen government regulation, government needs into cooperation with the private sector, supervision and guidance of the department. Third, we must improve the financing environment for investors, to broaden the investment channels for private capital. Fourth, cultivate professional personnel, the establishment of third-party organization, cultivate and reserve a familiar contingent of high-quality professional management of their investment industry conditions. Fifth, improve the benefit-sharing and risk-sharing mechanisms to ensure that public and private parties to achieve win-win cooperation. Sixth, improve the financial service system, with the power of finance; strengthen financial support to China's agricultural infrastructure. Lastly, we need to improve the operating environment of the PPP model to, accelerating the development of credit guarantee mechanisms.
Keywords/Search Tags:PPP mode, agricultural infrastructure, investment and financing, private
PDF Full Text Request
Related items