Font Size: a A A

Research On Schedule Management Of SG Group Supplier Portal Project

Posted on:2015-09-19Degree:MasterType:Thesis
Country:ChinaCandidate:M Z GaoFull Text:PDF
GTID:2359330512971362Subject:Project management
Abstract/Summary:PDF Full Text Request
In order to strengthen communication and cooperation with suppliers,reduce purchasing cost and ease the financial pressure,SG group supply company developed SG group supplier portal.This portal provides suppliers the purchase order,procurement planning,logistics,funds,performance evaluation and other aspects of information,realizing the sharing of resources.But in the management of the project,due to technical difficulties of the project,the tight time,the uncertain demand and the accuracy schedule estimation,it becomes the key to the success of the project realizing the effective management of project progress.This study is mainly study on the theory of project management schedule for the SG group supplier portal project,schedule planning,and Study on schedule control scheme,in order to ensure the smooth implementation of the project.The main research contents of this paper include the following three aspects:(1)Analysis of SG Company Supplier Portal project.Through the analysis of the SG group communication problems in supplier management,put forward to build the SG group portal supplier needs.Describes the design requirements and project characteristics of the SG group of supplier portal site content,and introduces the organization of project scope,project milestones and project.(2)The SG group Supplier Portal schedule.The first project work breakdown structure is determined according to the project objectives,secondly according to the project schedule,through the project activity sequencing,project duration estimates to develop network diagram project,using the network planning technique to determine the project critical path,making the project schedule plan,finally the project duration optimization,update the project schedule.(3)The SG group portal supplier schedule control.By tracking the progress of the project,find out the deviation in the project schedule,analysis of the causes of deviation,take system or technical measures,so as to realize the supplier portal project schedule control.Through the research of progress management of SG group website supplier portal project,formulates the schedule plan and schedule control of the project,ensure timely build communication platform between SG Group supply company and suppliers,to realize the sharing of information resources.At the same time,summed up the schedule control method of information system project in the research process,in order to provide a practical basis and experience summary for the information technology project of future.
Keywords/Search Tags:Supplier Portal, schedule management, network plan, schedule control
PDF Full Text Request
Related items