Research On Risk Management Of Gas Station Construction Project Of GXPC Company

Posted on:2018-04-21Degree:MasterType:Thesis
Country:ChinaCandidate:C Y LiFull Text:PDF
GTID:2359330518964280Subject:Engineering
Abstract/Summary:PDF Full Text Request
Development and construction of gas station,build strong product sales network,has important strategic significance,for PC energy group to build the whole industry chain to competitive advantage and realize the business value maximization.By system analyzing the main risk as well as the existing problems and shortcomings in terms of risk control,targeted to take corresponding risk control strategy and specific measure,thus reduce the uncertainty of project development and construction,and provide security for PC group to rapid develop network in Guangxi region.Gas station development needs through market research,feasibility research,land acquisition,engineering design,construction and so on,faced with market risk,land acquisition risk,planning risk,safety and environmental risk,cost and time limit,risks of construction quality and construction safety,and many other risks,considerable uncertainty.Among them,the biggest risk is market risk,and second is safety and environmental risk,cost and time limit,and risk of construction quality,moreover also should pay attention to prevent risk of construction safety.Aiming at risks control,GXPC company set up the corresponding project management institutions,formulated the related system of development and construction process,established a risk evaluation mechanism control of its first,shooting,and shot.But since the organization Settings are not reasonable,the imperfection of the system process,the lack of related personnel consciousness and ability,insufficient standard,risk assessment not enough specification,and other reasons,the development and construction risk control also has many disadvantages.In order to further control the various kinds of potential risks,GXPC companies need to strengthen institutional Settings,clear function interface,perfecting the system of process,establish risk putted forward,elaboration risk control requirements,improve the ability of backbone personnel business,standardized construction standard and strict controls of change management,strengthening the contractor evaluation,and take other targeted improvement,to perfect the risk control elements.
Keywords/Search Tags:Gas station, Development and construction, Risk control
PDF Full Text Request
Related items