Font Size: a A A

Research On Risk Management Of Petro China Station Building In Siping Developing Zones

Posted on:2017-02-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y H MaFull Text:PDF
GTID:2309330485988876Subject:Project planning and control management
Abstract/Summary:PDF Full Text Request
Oil depot and gas station together constitute the current oil industry distribution system, and the gas station as a finished oil sales enterprise service client’s terminal carrier, external responsible for the community to provide high quality products and services, to take on the responsibility for the production of refined oil sales enterprises. With the domestic refined oil market retail prices are becoming more stable, coupled with gas station related services business towards standardization, standardization development, gas stations have become major oil sales company’s main source of profit, so the oil sales enterprises have to increase gas station construction and development efforts, through a large number of people, financial, and material, and vigorously develop sales terminals, continuous improvement of sales network layout, in order to get more favorable position in the future market competition. Papers on the project risk management theory as the basis, according to Siping Branch Company Development Zone gas station construction projects as the research object, through to the project influence the whole process of all kinds of risk factors identification, by using fuzzy comprehensive evaluation method in the risk assessment of the project, and on this basis, the proposed for risk prevention strategies, to deal with risk.The paper is used in the course of the study, the four part of the paper is to analyze the feasibility of the part of the research, the second part of the paper is to carry out the feasibility analysis of the first part of the research. The three part is the analysis of the construction project. The 5 part is the design of the development zone gas station. Is a right The feasibility analysis of the economic benefit, including financial evaluation and national economic evaluation analysis of two aspects; the third part is about the research on the risk identification and assessment of the construction project of the gas station, the risk identification section first describes the main features of gas station construction project investment, and risk factors identification and interpretation of its characteristics, risk assessment part is the gas station, including selection of construction project risk evaluation method of fuzzy comprehensive evaluation of three aspects of project and project risk sensitivity analysis; the fourth part is the conclusion of the above parts of the content on the basis of the system, put forward the risk monitoring and coping strategies of construction project gas station, some risk control strategies are put forward in Siping Branch step, the construction project risk control measures and the need to use the technology and tools of gas station, the risk should be On the part of the strategies, the strategies are put forward from the aspects of safety operation, facilities, natural factors, investment decision-making, cost control, market competition, policy environment, construction and technical aspects.
Keywords/Search Tags:Risk management, gas station construction project, risk identification, risk assessment
PDF Full Text Request
Related items