Font Size: a A A

Research On Post Evaluation Of HH Windfarm Project

Posted on:2018-01-07Degree:MasterType:Thesis
Country:ChinaCandidate:L LiFull Text:PDF
GTID:2359330542950994Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of China's economy in recent years,people pay more and more attention to the requirement of environment protection.Energy as the basis for the development of national industry,how to develop the sustainable green energy has become a prerequisite for the continuous economic development.As a representative of green energy,wind power has the characteristics of saving energy consumption,small pollution,sustainable use and mature technology,and it has begun to improve its position in China's energy structure.By statistics,at the end of 2015,China's wind power installed capacity has breakthrough 130 million KWH.Following the instructions of the national's "The 13th five-year plan",China still has 79 million KWH wind power installed capacity plan.Based on the huge capacity and planning of wind power,we need a simple,direct,strong operability,reliable,unified evaluation system to find the disadvantages of previous wind farm projects to better guide the development,construction and operation of new wind farm projects.Based on the HH wind farm project as the research object of post project evaluation,this dissertation estimates the economic benefit,influence and sustainable ability of the HH wind farm project during its development,construction and operation,finally evaluates the overall success with the logical frame method and the improved degree evaluation method.Evaluation results show that the HH wind farm project's procedure is completely legal compliance during its development,construction and operation.The unit operation stability and the profitability of the project is very good without impact to the surrounding residents and ecological environment.The project has strong sustainable ability in the policy,market and wind resources.This dissertation also summarizes the experience of the HH wind farm project and puts forward some reasonable suggestions to the development,construction and operation of the subsequent wind farm project.
Keywords/Search Tags:Wind farm project, Post project evaluation, Operation indicators, Procedures settlement
PDF Full Text Request
Related items