Font Size: a A A

Research On The Project Planning Of Middle Level Reserve Cadres Team Construction In Z Oilfield

Posted on:2016-11-12Degree:MasterType:Thesis
Country:ChinaCandidate:J K ZhangFull Text:PDF
GTID:2359330563451715Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,vagaries of the international oil market,oil companies are facing the more and more complicated environment and the problems encountered is more challenging.Oil field is also facing enormous challenges,so that the enterprise cadres have higher requirements.The construction of middle level reserve cadres play a very important strategic role in the Z oilfield enterprises,which determines the future development of Z oilfield enterprises.In this context,the selection,training a group of ability,professional,have a moral of the middle level reserve cadres,for the development of Z oil companies is an urgent important work.And the project management of the construction of reserve cadres can effectively integrate the resources,management system of the reserve cadres,improve the management training measures and management mechanism,and improve the system of reserve cadres.Z oilfield has always attached great importance to the construction of middle level reserve cadres,but as of now,there are still some problems in training ?appointment?assessment?management and so on,which need to be continuously improved.This study is based on the research of the relevant domestic and foreign research literature,combined with the current situation of the construction of the middle level reserve cadres in Z oilfield,and the existing problems in the construction process of the middle level reserve cadres in Z oilfield.Then,based on the depth analysis and summary,using the idea of project management,the planning and design of the middle level reserve cadres in Z oilfield is put forward.According to the basic steps of project management,the project plan,basic principles and design basis are put forward.And then put forward the specific measures to ensure the implementation of the project.Finally,through the analysis of the full text,the project planning is summarized,and the shortage of the research is pointed out.
Keywords/Search Tags:middle level reserve cadres, project management, planning and design
PDF Full Text Request
Related items