Font Size: a A A

Shandong Yatai Machinery Co.,Ltd. Feasibility Study On Construction Project Of Container Crane For Port

Posted on:2019-01-01Degree:MasterType:Thesis
Country:ChinaCandidate:Y J WangFull Text:PDF
GTID:2359330566465781Subject:Project management
Abstract/Summary:PDF Full Text Request
The high-end equipment manufacturing as the focus of international competition,plays a decisive role in leading the development of manufacturing industry,the core is put the innovation in the first,which determines the potential and orientation of the innovation.The high-end equipment innovation project(2016-2020)"proposed to focus preponderant resources to develop a number of high end equipment,improve the industrial innovation and development capability and competitiveness.The container crane as the high-end equipment manufacturing industry-a category of marine engineering equipment,has a strong policy advantages and development potential.Through the qualitative and quantitative analysis to Shandong Yatai Machinery Co.Ltd.port container crane construction project,look for relevant issues.Take the Shandong Yatai Machinery Co.Ltd.port container crane construction project as the research object,use the relevant theories and methods of project feasibility research and financial evaluation of the project carried out a feasibility analysis.The paper is divided into five parts: the first part is the introduction,including research background and the significance,research status at domestic and abroad,research ideas and methods,technical route and the innovation and shortage.The second part of the project overview,including the construction of the project background,market analysis,construction conditions,production scale and production plan,process technology,equipment,engineering construction scheme etc.;the third part is the financial evaluation of construction project,including investment estimation,project financing,profitability analysis,sensitivity analysis,breakeven analysis,economic benefit analysis,risk evaluation;the fourth part is the social and environmental impactassessment of construction projects,including the basis,evaluation of construction project environmental and social impact standards,governance measures,social impact analysis;the fifth part make a conclusion on the feasibility of the project results.The project income tax NPV of 156.811 million RMB,after tax internal rate of return is25.6%.Related data shows the project has a certain profit ability and anti risk ability,which is feasible to meet the relevant index' requirement of investors and stakeholders.
Keywords/Search Tags:high-end equipment, financial evaluation, environmental assessment, social evaluation
PDF Full Text Request
Related items