Research On Risk Management Of Bank Information System Project Construction Of A Rural Credit Cooperatives

Posted on:2018-06-02Degree:MasterType:Thesis
Country:ChinaCandidate:X ChuFull Text:PDF
GTID:2359330566956869Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the rapid development of the information age and the advent of Internet banking,the banking industry is intensifying competition.It has become the strategic choice of banking financial institutions to carry out the construction of information system project to improve the core competitiveness of banks.However,how to effectively prevent and reduce the risk of information technology project construction,and effectively improve the quality of project construction,the project has become the key to the success of the construction and application of the key.In this paper the banking information system project risk management as the research object,firstly analyzes the status quo at home and abroad especially the banking information system project risk research,expounds the basic concept of information system project risk management and the main theory.Then,in the A provincial rural credit cooperatives as an example,according to the basic situation of the agricultural information system construction project risk management,analyzes the risks and problems currently faced in the process of information system in the construction project,and several examples are conducted in-depth analysis of the risks and problems of different.Then,according to the risk management process puts forward RLF risk identification model,according to identify the nineteen kinds of agricultural credit risk in the information technology in the construction project;using XX system as an example of how the letter in the project before the line to carry out safety risk assessment;according to the high,medium and low three grades respectively from the organizational strategy layer,process layer,project Department of the tactical level,formulate prevention,mitigation and emergency three measures,innovative established information technology project risk management "three order" coping model;according to the risk planning,risk monitoring,risk assessment,risk of measurement and analysis,continuous improvement in five stages,is established the construction of risk control "five segment" model of information system project.Finally,the application and practice of how to set up the risk prevention and control system based on the life cycle of the project are introduced.
Keywords/Search Tags:InformationSystem, Risk Management, Life Cycle
PDF Full Text Request
Related items