| As the auto industry growth is slowing,auto parts enterprises face increasingly fierce market competition and the demand for higher quality and cost optimization,Which requires the enterprise managers in the face of the project requires a structured development method in the process of development and management,project management activities can effectively coordinated resources and personnel allocation,and make the effective implementation of the project plan and track project schedule,ahead of risk control and the quality planning.In this paper,through the combination of theory and case research to carry out the research.First introduces the research background and research significance and research status at home and abroad,briefly describes the main content and research method and research framework,and then to the project quality management and the classification and characteristics of project organization structure and automobile industry quality system,supplier quality management related theory is summarized for the follow-up problem analysis theory,after the V company and introduces the present situation and problems of automobile air conditioning project background and project management,further raises the automobile air conditioner V company quality management the main problems of the project: the project communication caused by quality problems,including supplier quality problem caused by supplier part approval process quality issue and supplier control lead to the quality problem of the special properties,engineering change caused by quality problems,and project development to solve the quality problem of the problem caused by low efficiency.Through the analysis of the above questions to find out the causes of problems and gives the corresponding improvement measures.For project communication caused by quality problems,puts forward improvement scheme from two aspects,on the one hand improvement project organization structure,add the project manager to coordinate the production of the track problem,optimization of the project team construction at the same time.On the other hand effective improvement project meeting system formed record and tracking problems are completed on time.For supplier quality problems,puts forward improvement scheme from two aspects,on the one hand,strengthen supplier parts approval process control solution to the problem of supplier parts cannot be approved on time,on the other hand,in order to strengthen the management of process of special features to solve special features missing entries and monitoring adverse problems,combining the above two aspects to solve the quality problem of the supplier.For engineering change caused by quality problems,from strengthening the engineering change management to improve the implementation process.Separate project prophase and batch production engineering change management,at the same time,strengthen the change of the electronic data systems record and tracking,and at the same time to strengthen the team to change progress tracking clear functional staff responsibilities,to avoid quality problem for engineering change.Quality problem to solve the problem caused by low efficiency,improve the method of problem analysis and at the same time establish electronic systems,through the electronic system to track the quality problem of the client and the inside,introduces the improved process problem analysis methods,application of the improved analysis method of case analysis problems.This paper puts forward the specific project quality management solution is reference and reference value for other auto parts enterprises. |