Font Size: a A A

The Study On Passenger Transport Facilities Configuration And Streamline Optimization Of Qiqihar Railway Station

Posted on:2018-08-22Degree:MasterType:Thesis
Country:ChinaCandidate:S L DuanFull Text:PDF
GTID:2382330566489544Subject:Engineering
Abstract/Summary:PDF Full Text Request
In recent years,China’s railway passenger traffic volume presents a rising trend,which accounted for the proportion of high-speed rail passenger rail passenger traffic continued to improve.According to the statistics of China Railway Corporation in 2016 1-12 month national railway main indicators show that the 2016 annual railway passenger volume was sent to 2.77 billion,an increase of over the same period last year by 11%.With the opening of Harbin to Qiqihar high-speed railway in 2015,the passenger volume of Qiqihar station has increased annually.In 2016,from October 1 to October 7,the total number of passengers completed 230,700 people,a single-day delivery of up to 45,700 people,the total number of passengers completed 166,400 people in 2015.So the number of people in 2016 than in 2015 increased by 64,300 people,an increase of 38.6%.Railway passenger station is the railway department to handle passenger transport business,and for passenger to get off and to board,its main function is to convey passengers,to solve passengers travelling,get off and transfer,and so on,the passenger station of the passenger transport facilities and the distribution of passenger flow is reasonable directly affect the bus station work.Therefore,the research and analysis on how to optimize passenger flow and passenger transport facilities in the railway station has guiding and referential significance to the actual work of Qiqihar station.In this paper,the Qiqihar Railway Station passenger facilities and passenger flow lines and other issues were studied.First of all,combined with the domestic and foreign scholars to study the passenger flow line and passenger transport facilities of the railway passenger station,the Qiqihar Railway Station passenger facilities and passenger flow line are analyzed.Secondly,based on the data collected by field investigation,this paper makes a study on the law of the arrival of the Qiqihar Railway Station,the time of the ticket,the service time of the automatic ticket machine,the service time of the real name ticket inspection and so on.Thirdly,the Qiqihar Railway Station to establish a simulation model based on AnyLogic model,setting the passenger arrival rate,ticket vending,artificial Business Hours Business Hours,real name ticket Business Hours,train arrival time parameters.Finally,to evaluate and analyze the simulation results,find out the bottleneck of Qiqihar Railway Station passenger flow and put forward the corresponding improvement scheme,a reasonable allocation of passenger transport facilities,the simulation results are analyzed to help improve the quality of service of Qiqihar passenger station.
Keywords/Search Tags:Qiqihar Railway Station, passenger line, passenger facilities, Simulation modeling
PDF Full Text Request
Related items