Evaluation Of Railway Construction Project Standardized Management System Construction And Platform Construction

Posted on:2018-01-29Degree:MasterType:Thesis
Country:ChinaCandidate:K DuFull Text:PDF
GTID:2382330566989560Subject:Engineering
Abstract/Summary:PDF Full Text Request
By the end of 2016,China had a total of 124,000 kilometers of railway business,with high-speed rail reaching more than 2.2 kilometers.Our country in remarkable achievements at the same time,our country is also facing the current railway construction project of large-scale and high standard requirements,new technology,new equipment,new technology,the application of new materials,factory,mechanization,specialization,informationization continues to strengthen,can achieve standardization in the railway construction project management is the key of the current railway construction.Relying on big Dan railway construction project,full combination of standardized management thought and method,in order to achieve the quality,safety,time limit for a project,investment,environmental protection,technology innovation "six integration" management requirements,the main research questions as follows:(1)to explore the standardization management of railway construction in the current stage.Through the development of China railway construction engineering standardization and system characteristics,standardized management,observes the current stage of railway construction project is imperfect factor: railway construction project evaluation index system of comprehensive standardization management;The platform for standardization of railway construction needs to be improved.The evaluation indexes of standardization management of railway construction were summarized.Use WBS work breakdown structure method and K-means discretization of the rough set method has carried on the induction and the standardization of railway construction project contracted,established the evaluation index system of railway construction project standardized management.A standardized management evaluation model for railway construction was established.Through the entropy weight method and fuzzy comprehensive evaluation method of combining,standardization of railway construction project evaluation model is constructed,using the model of Dan large railway construction project bid before the period of DT2 zhuang has carried on the comprehensive evaluation of standardization management,the results show that before the period of bid DT2 zhuang standardization management evaluation score of 923 points,bid for outstanding standardized management.(4)to build a standardized assessment platform for railway construction projects.Through the use of asp.net and SQL database knowledge is constructed with the front desk display module,search module,background management module and the standardization of railway construction project standardized evaluation platform module evaluation platform,through the construction of the four modules,implemented informed standardization at home and abroad;The evaluation of the standardization of railway construction projects,the evaluation contents of the query,and the query of the standardization of the contents of the correction are realized.
Keywords/Search Tags:standardization of railway construction projects, Entropy method, Fuzzy comprehensive evaluation method, Standardized evaluation platform
PDF Full Text Request
Related items