Study On Cost Estimation,Budget And Control Of Geng Yang Prefabricated Housing Project In Tangshan

Posted on:2017-09-15Degree:MasterType:Thesis
Country:ChinaCandidate:M H LiuFull Text:PDF
GTID:2382330572465585Subject:Project management
Abstract/Summary:PDF Full Text Request
After ten years of this century,China's construction enterprises in the field of assembly technology continue to explore and research,as well as Europe and the United States on the mature technical level of study and reference,China's overall assembly-type housing construction technology system has made great progress and progress.With the fiery development of China's real estate industry,the current construction of the traditional cast-in-situ model of high energy consumption,high pollution,low efficiency,security risks are relatively prominent,the state and local governments have introduced housing industrialization support policies to encourage Local and enterprise development of assembly-type construction technology,vigorously develop green building,and approved the construction of a number of national demonstration housing industrialization base.PC assembly-type residential system as an important mode of industrialization in the housing,the current development is limited by the lack of more landing items,resulting in the applause of the awkward situation.The reason is that the high cost of PC assembly-type residential construction,hindering the PC assembly-based technology model in the construction market promotion,so that real estate developers prohibitive to the local government's industrial layout and assembly-related construction industry-related businesses Development has brought great challenges.In this paper,the project cost,project cost management,cost estimation,budget and cost control theory of Tangshan Geng Yang PC Assembled Housing Project are used to analyze the cost composition and cost estimation of Tangshan PC-based housing project.The project management,the contract management and the BIM technology,the Internet technology application and so on,to find out the cost control for the PC assembly type housing project,and to reduce the project cost of the practical approach.This paper systematically analyzes and studies the cost management of PC-based housing project in Tangshan.By using the methods of literature induction,field investigation and case study,this paper obtains the research data,and then obtains the research results.Using the project cost management system Method to solve the Tangshan Geng Yang PC-based housing project cost management issues,reduce project costs for the company in the future PC assembly-type project cost management to provide a good experience.
Keywords/Search Tags:cost estimation, cost budget, cost control, fabricated building, BIM technology
PDF Full Text Request
Related items