Font Size: a A A

Research On The Cost Estimation,Budget And Control Of Baosteel Tidal-Flat Storage Area Foundation Treatment Project

Posted on:2017-12-17Degree:MasterType:Thesis
Country:ChinaCandidate:W SuFull Text:PDF
GTID:2382330572965891Subject:Project management
Abstract/Summary:PDF Full Text Request
In the current,steel industry has entered a "normal winter".The logistics cost of iron and steel company has been paid more and more attention.To make full use of this scarce resource of the tidal-flats,to improve logistics efficiency and quality,and to reduce logistics cost,it is necessary to build new storage facilities in the region of the tidal-flats,and to build wisdom logistics base.Baosteel tidal-flats storage area foundation treatment project is the first implementation of blocks in the tidal-flats storage region.The cost management of the project should be full attention,and should be promoted to the important position.In order to ensure project success,and to make the cost performance control within budget,it is necessary to apply the project cost management and the method.The essence of the project cost management which is by the basic principles of project management and the various scientific and reasonable method and means,is to strengthen cost control,to optimize of project cost and to pursuit of economical maximization.Therefore,the practice of project cost management system optimize the cost management methods and means.It is beneficial to enhance the competitive of the corporation and the ability of sustainable development.Based on the project and the project content of the bidding,construction organization design and implementation,the thesis studied the project work breakdown structure,resource planning,cost estimating,cost budgeting and budget target decomposition,the cost control system and cost control countermeasures and Suggestions,etc.The research of the thesis,in which we apply the method of combination of theory with practice,literature research method and case method etc.and the basis of related cost data,further discusses the project cost estimation,cost budget and cost control phase project cost management of the key factors,the actual cost of the project under control.In order to achieve the optimization of project cost management by the research,and to provide reference and reference for the cost management of the subsequent bid.
Keywords/Search Tags:Cost Estimation, Cost budget, Cost control
PDF Full Text Request
Related items