Research Of Industrial Television System Project Schedule Management Of The DJ Waterworks Central Control Room

Posted on:2019-03-21Degree:MasterType:Thesis
Country:ChinaCandidate:D ChenFull Text:PDF
GTID:2382330593950553Subject:Project management
Abstract/Summary:PDF Full Text Request
Beijing is a modernized metropolis which resident population has been more than 20 million,in recent years,because of persistent dry spell in the north area,shortages of water supplies have long been a serious problem in Beijing.In recent two years,because of the South-to-North Water Transfer project was applied great successfully,Beijing has continued to accept the first grade water from Danjiangkou reservoir in Hubei province.However,the Beijing per capita share of water resources is far below the national average,and under the standard line of internationally recognized extreme water resource scarcity.In Beijing and even the whole China,the DJ waterworks was the maximal water supply capacity surface-water works with a daily water supply capacity of up to 1.71 million cubic meters,not only stands the 50 percent of the urban water supply capacity,but also was.The reconstruction project of central control room was the dispatch center of DJ waterworks,it could improve the scheduling possibilities and work efficiency,will make further improving the safe water supply capacity of the capital.While there are some problems in this reconstruction project,such as diverse and complex construction environment,much crossover work,tight project schedule and influenced widely,and the DJ waterworks also lacks experience of project schedule management.Thus the scientific and operable project schedule plan with the continuous effective schedule control measures,it could make sure to finish the project with the required time and quality.Based on the relative project schedule management research and the actual management situation,the industrial television system reconstruction project of the DJ waterworks central control room apply some project schedule management methods like Work Breakdown Structure,Gantt chart and Critical Path Analysis to finish the project schedule plan with the modern project management software.Through further analysis of the logical relationship between work tasks,optimized the original schedule plan of the reconstruction project in combination with construction resources,put forward the scheme to solve the issues to influence project schedule,finally,the project is finished ahead of time.The exploration and research of the industrial television system reconstruction project of the DJ waterworks central control room will not only expand and enrich the project schedule management theoretical knowledge system,but also provide the practical experience and guidance method for our water treatment industry project schedule management with the reference value for the relevant enterprises in the industry.
Keywords/Search Tags:Schedule management, Schedule plan, Waterworks, central control room
PDF Full Text Request
Related items