| With the continuous growth of power capacity in China,the problem of unreasonable power supply structure,partial overcapacity is gradually highlighted.In response to the central demand for high-quality development,the relevant policies of the power supply side reform have been gradually introduced by the local governments.By opening up the electricity market,breaking the standard electricity price and introducing the competition mechanism on the power supply side,they hope to gradually eliminate the backward production capacity and enhance the overall competitiveness of the power supply side.Gas turbine power generation is an important way of generating electricity in developed countries like Europe and America,it has the advantages of clean and environmental protection,good peak-shaving performance and so on.But in China,because of the scarcity of natural gas resources in the market and its high price,gas turbine power generation has not been popularized.But with the continuous optimization of China’s energy structure,reducing the amount of coal,increasing the proportion of clean energy is to represent the general trend of energy reform.As a kind of clean and low carbon energy,natural gas must be a pillar of energy to optimize the energy structure of China,at the same time,gas turbine power generation will also get considerable development in this process.Although in the current two-part electricity price policy,there is still a certain degree of survival insurance of the gas turbine power plant.But throughout the gas turbine power generation industry,as an immature industry,its production management is not fine enough,its production cost control capacity is also relatively weak.Although the short term it has not been directly involved in the electric power reform,only participated in the competition of the gas turbine power generation,but with the continuous expansion of the industrial scale and the deepening of the power supply side reform,its future is bound to face more serious challenges.Lean production,as an advanced production mode,will provide a more reasonable,efficient and continuous improvement path for the production management of gas turbine power plants.This paper unifies the actual production situation of L power plant,uses Why-Why analysis,value flow analysis of the lean production to deeply diagnose its main energy consumption indexes,and finds out the waste of value in production process.Combined with the theory of strategic management,this paper also analyzes the internal and external situation of L power plant,uses the SWOT analysis to point out its development direction.The overall strategic goal of lean production under this development direction is also established.Using process-based process reengineering to realize the optimization of production process,through the implementation of total quality management,to promote the standardization of operations,and further solidify production results,at the same time to strengthen the operation of the market,this paper provides a way to reduce the production cost,and takes various measures to further exert the main benefits of human beings in lean production,so that the lean production of power plant L can be promoted steadily.The findings of this paper can reflect the situation faced by the gas turbine power plant under the basic aspects of the current electricity market,it also provides some reference for the promotion of lean production,optimization of production measures,reduction of production cost and promotion of overall competitivenessfor gas turbine power plants. |