Font Size: a A A

Analysis And Design Of Project Plan Management Platform For Power Grid Engineering Review

Posted on:2021-05-19Degree:MasterType:Thesis
Country:ChinaCandidate:F ShiFull Text:PDF
GTID:2392330605471350Subject:Engineering Management
Abstract/Summary:PDF Full Text Request
Power grid project evaluation is the first step to investment construction for enterprises,which provides advisory services for the project and including defined scope of the project,feasibility assessment and plan formulation.Such as the resource,cost and projects' quality are related to the evaluation.According to statistics,China spends hundreds of billions of yuan on power grid project construction every year,and any mistake in the evaluation will bring huge economic losses.Although the domestic grid engineering review related enterprises have made great progress at present,in the face of the ever-changing economic and technological environment at home and abroad,the preliminary grid engineering review work is also faced with the upgrading requirements of refined management mode,especially in the application of project planning management software informatization.According to the current situations,this paper mainly aims at analyzing and designing the application scenarios and requirements of power grid engineering review project plan management,bases on the existing theoretical results and considers users' requirements.And this program management method combines the mainstream technical architecture,language,database and the security authentication method in the technical field,which realizes Gantt diagram theory in the planning,organization,control and coordination of the whole process.At the same time,it realizes the informationization and modularization of the power grid engineering review and design project business and related data.The testing ensures the availability and robustness of the system.The innovations could be found as the following three aspects.Firstly,the project features cover the entire business domain and life cycle of grid review project planning management,avoiding the additional design and redundant operations of many high-end software products,while supporting integration with other business processing systems.Secondly,this system will complete the combination of Gantt chart and calendar task chart of grid review project plan management,and achieve the traceability of the same plan history version.Thirdly,this system will transform loose plan management based on personal experience into centralized standardized management,and combine single project plan management with analysis.This research is based on the original theoretical results,based on the current mainstream technology combined with the grid review project plan management specific needs to build a project plan management system.The operation of the system can effectively improve the quality and efficiency of grid engineering review project plan management,meet the requirements of efficient management of daily review work,reduce costs,and ultimately improve enterprise benefits,which plays an important role in the practical application.
Keywords/Search Tags:Project plan management, power grid engineering review, horizontal diagram, J2EE, MVC, data model
PDF Full Text Request
Related items