Font Size: a A A

Study On Quality Control Of Weifang Linqu Dongcheng Street 10kV Line New Project

Posted on:2020-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:K PengFull Text:PDF
GTID:2392330611987977Subject:Project management
Abstract/Summary:PDF Full Text Request
With the rapid development of social economy,the quality of life of people is also improving.The electrification equipment has reached the effective popularization in rural areas.At present,there are 4 stations in the Dongcheng Street area which have been seriously exceeding the electric load,3 stations which have exceeded the power supply radius and 4 stations which have low voltage It is expected that the new load will reach 520 kW in 2019,and even the load rate of individual stations will exceed80% significantly.In order to better meet rural electricity demand,in the future development needs to take into account the actual development situation and needs of the local increase in the distribution of relevant new points,therefore,it provides an effective way to solve the problem of low voltage and meet the demand of rural power under the condition of significantly reducing the power supply radius.For this reason,the State Grid Shandong Electric Power Company Weifang Power Supply Company has added 10 kv stations to the area In the analysis of this paper,the quality control in the construction of 13 new projects in Dongcheng District,such as 10 kv Liu Jia Dong Zhuang,is discussed.In this paper,13 new projects in district including Liu Jia Dong Zhuang are taken as the main research object,and the qualitative analysis and the Quantitative analysis are combined in the research method This paper introduces the research background,research goal and significance,domestic and foreign research status,research content,research method and technical route.Secondly,the connotation,content,principle and process of project quality control,and the related theory of project quality control are expounded.Thirdly,the paper introduces the current situation of the project,the necessity of construction,the construction scheme and the present situation of the project quality control.Then,the quality control of the project is analyzed from the three stages of preparation,construction and acceptance.Then,based on the analysis of the theoretical influencing factors,this kind of functionalfactor analysis is put forward.On the premise of combining relevant data and reference materials,the comparison between before and after is carried out through the calculation of data The transformation from qualitative analysis to Quantitative analysis analysis to make the results more convincing is the premise of the comprehensive application of AHP and fuzzy comprehensive evaluation of the application of systematic analysis of the quality control level of the project.Then,the paper puts forward the quality control measures of the pre-preparation phase,the construction phase and the acceptance phase of the project,and provides the analytical thinking and process for the application of PDCA cycle control method in the sub-project of the project wire erection.Finally,it puts forward the safeguard measures of project quality control from three aspects of personnel organization,system and technology.
Keywords/Search Tags:Distribution Network Construction Project, Quality Control, PDCA, Guarantee Measures
PDF Full Text Request
Related items