Font Size: a A A

Research On The Construction Of Uniform Registration Information Platform Of Real Estate In Wuwei City,Gansu Province

Posted on:2019-11-09Degree:MasterType:Thesis
Country:ChinaCandidate:T X GuoFull Text:PDF
GTID:2416330596955021Subject:Public administration
Abstract/Summary:PDF Full Text Request
The interim regulations on registration of real estate was formally implemented on March1,2015.According to the "Regulations",the State Council's Land and Resources Department shall assume the responsibility for the registration of immovable property such as land,houses,forest land,grasslands and sea areas nationwide,and supervise the registration of real estate.At present,the Ministry of Land and Resources at all levels of the Ministry,province,city and county is responsible for coordinating relevant departments at the same level and establishing a unified registration information platform for real estate at the corresponding level.The construction of the unified registration information platform for real estate in Wuwei is progressing slowly.At present,problems such as the unclear right and responsibility of the relevant departments,the interests of the departments exceeding the interests of the projects,the poor coordination between departments,and the existence of information asymmetry have been exposed.Project management is an important part of modern management science and is suitable for solving the complex problems of multi-sector coordination and achieving higher operational efficiency.The application of scientific project management methods in the construction of real estate unified registration information platform project can effectively improve the management level and promote the smooth development of the project.In view of the current situation of the construction of the unified registration information platform of real estate in Wuwei,this paper introduces the concept of project management and focuses on the planning control in the process of project management.This paper studies the application of the project management theory in the construction of the unified registration information platform of real estate in Wuwei city,and puts forward a set of management mode suitable for the current administrative system.The model starts from the design of project organization structure,selects the organization form suitable for the project,and then decomposes the project structure,elaborates the target and clarifies the responsibility.Again through the process design,project according to the dynamic process management information platform can be divided into initiating,planning,implementation and closing stages,specification at various stages of the work flow,clear the specific work content of the project participants,again according to the static management into cost management,quality management,schedule management from several aspects,such as clear the various levels of the key work content,at the same time put forward to develop owner party conduct,strengthen communication management,strengtheningthe supervision function,perfect project acceptance and evaluation system after countermeasures,such as construction work to provide some ideas for the future similar projects.
Keywords/Search Tags:Unified registration of real estate, Construction of information platform, Problem, Countermeasures
PDF Full Text Request
Related items