Font Size: a A A

Research On Post-evaluation Index Construction Of EHSM Information System Project In Z City

Posted on:2020-08-26Degree:MasterType:Thesis
Country:ChinaCandidate:Y X YangFull Text:PDF
GTID:2416330611965899Subject:Project management
Abstract/Summary:PDF Full Text Request
With the gradual development of entertainment establishments and hotels,The requirements for control and control of the public security system have also been gradually improved,In order to implement the decision making plan of Li Chunsheng,the provincial Party committee and vice governor of the Provincial Public Security Bureau and the director of the Provincial Public Security Bureau,on the construction of an innovative social security prevention and control system,guided by ?The general plan for strengthening the public security system in Guangdong public security organs?,actively adapt to the new normal situation of the development of public security management in hotels,around the implementation of the "two goals" and the "three levels" of the mission requirements,Guangdong province entertainment establishments and hotel industry public security management information system.This research chooses Z City entertainment service place and hotel industry public order management information system as the research object,following the standard requirements of the state and industry,guided by actual demand,around practical application,technology construction,working mechanism and so on,to formulate feasible overall construction plans,technical plans and specific implementation plans.Firstly,this paper introduces the related concepts and theories of project post-evaluation,combines the relevant concepts and processes of ITIL framework,builds the index evaluation system of project overall post-evaluation,and determines the analysis method based on Fuzzy Analytic Hierarchy Process(FAHP),and elaborates the specific content and evaluation methods in detail.Secondly,according to the specific content and index system of post project evaluation,combined with the example of Zhongshan entertainment service place and hotel industry public security management information system project,establishing post evaluation index system and comprehensive post evaluation model of information management system for travel industry public order management,This paper analyzes and evaluates the public order management information system project of Zhongshan entertainment service place and hotel industry from various angles.Finally,according to the results of the evaluation of Zhongshan entertainment service places and hotel industry security management information system project is summarized,and Zhongshan city public security management information suggestions,In order to give practical suggestions for future information system project construction,the index system of the evaluation system for information system project construction is further improved by adopting advanced evaluation theory and method,and the evaluation index system of the project is evaluated by the method of fuzzy analytic hierarchy process,which can well solve the problems caused by each other.The impact of information system project evaluation has a very good guiding role.
Keywords/Search Tags:Post evaluation, IT Infrastructure Library, FAHP
PDF Full Text Request
Related items