The Research On Cost Management Of CX Railway ? Standard Project

Posted on:2019-01-25Degree:MasterType:Thesis
Country:ChinaCandidate:Y L SunFull Text:PDF
GTID:2429330548467333Subject:Traffic engineering project management
Abstract/Summary:PDF Full Text Request
In recent years,with the vigorous development of high-speed rail technology in our country and the large-scale construction of railway projects and national "One Belt And One Road" strategy,the railway project has witnessed explosive growth,which has brought good development opportunities for the railway construction enterprises,but also attracted a large number of competitors to participate in it.In the process of competing for international orders,there has been a fierce market competition.In order to win the market competition,China railway construction enterprises must further strengthen the comprehensive management of railway engineering projects,especially pay attention to the cost management.From development present situation,although the majority of China's railway construction enterprises have similar level of technical strength,but there is a big difference to the project cost management,many enterprises of project cost control is poor,this not only affects the profitability of the enterprise itself,also affected the competition of the initiative.A nutshell,China railway construction enterprises want to win orders from the bidding,and guarantee the project profit targets,will have to ensure the construction quality and progress under the premise of improving cost management ability.CX railway ? this paper selected the project cost management as an object of case study,the integrated application of the earned value method,target cost method,homework cost method,and other analysis methods,the final comprehensive analyses the related content of the project cost management,target cost method here is the backbone of the cost control system,and to guide the operation of the whole system,through the cost target setting,cost planning and cost target control to achieve the purpose of cost control,arguably,target cost method is covering the whole process of project cost management strategy.Specifically in the early planning stage,the need to design a concrete construction plan,which includes the construction process,construction standards,materials,equipment,etc.,at the same time combining forecasting labor price,the final forecast and determine the target cost of the project.After determining the target cost,decompose it into a cost plan that is easy to control.In the process of project implementation,the cost calculation cost and the earned value method were used to compare and analyze the cost of the project,and the corrective measures were adopted according to the results.Had the plan requires new ways to achieve goals,avoid the actual project cost is beyond the set value,so the need for all the costs associated with specific responsibility main body,also is the decomposition of target cost,and assigned to different participants,do their job,finally complete the degree of responsibility to evaluate complete rewards and punishment and even eliminated,forming a goal,methods and measures of control system.CX railway ? through the cost control system in the application of the project,and according to actual ? mark CX railway project,through the homework package build,cost plan,schedule and cost control,from work to the project cost accounting,cost analysis,the responsibility division and assessment in the fusion of multiple methods used to build the aspects of cost control system is verified,and at the same time of CX railway ? standard,summarizes the experience of controlling project cost,project cost control is pointed out in terms of the subcontract management,change the claim problems,and Suggestions for improvement are given for points out problem.
Keywords/Search Tags:railway construction enterprise, cost management, management method, control system
PDF Full Text Request
Related items