Font Size: a A A

Application Analysis Of Bidding Procurement Based On LCC

Posted on:2019-10-14Degree:MasterType:Thesis
Country:ChinaCandidate:Q LiangFull Text:PDF
GTID:2429330566467981Subject:Business administration
Abstract/Summary:PDF Full Text Request
The new round of electricity reform in the country requires the company to speed up the construction of the power grid and put forward higher requirements on the quality of goods and equipment procurement.In view of the current number of suppliers,the products have different quality level,the traditional electric power equipment procurement short-term cost,long-term cost,lead to a vicious competition,suppliers equipment quality decline.To this end,state grid corporation proposed to build a "one strong and three excellent" modern company,and build a world-class enterprise with global competitiveness.Based on the research of life cycle management system of the company's assets,this paper makes a clear understanding of the total life cost of the equipment by analyzing the total life cost of the equipment.By now convenient quickly big data to the corresponding asset life cost data analysis,through the reasonable model to integrate these assets of large data into an organic system,realized the full life cycle cost evaluation of suppliers,and the equipment LCC quantitative evaluation for public bidding of the bid assessment on the basis of.The existence of this method can effectively promote the standardization of bidding work,at the same time,the service level and service quality of the supplier can be raised to a higher level.Paper first to domestic and foreign assets life-cycle cost related theory made a detailed review of research literature,illustrates the application of assets life-cycle cost analysis,composition and related theory knowledge,lay a theoretical foundation to the research of this article;Secondly,the thesis thinks that exist in the power companies bidding procurement process design is not standard,the lack of estimating the cost of the maintenance phase,big data technology support is insufficient,and imperfect grading rules set problem,and found that organization set unreasonable,inadequate management system,affected by traditional bidding procurement mode is deeper and lack of risk aversion measures equation to explain the cause of the problem.Thirdly,based on the existing problems and the reasons,the paper puts forward the specific application plan based on the asset total life cost bidding procurement.In the end,the paper proposes the corresponding guarantee measures for the bidding procurement scheme based on the whole life cost of assets:(1)the organizational structure for improving the implementation of the scheme;(2)further improve the system;(3)innovate management methods;(4)improve risk aversion measures,etc.
Keywords/Search Tags:SN province power company, Life cycle cost, Power purchase
PDF Full Text Request
Related items