Time Management Research In Information Services Project

Posted on:2018-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:F XiaFull Text:PDF
GTID:2439330596988967Subject:Industrial engineering
Abstract/Summary:PDF Full Text Request
The information technology service industry is a knowledge-intensive industry,and the growing user demand has led to the development.However,the industry is gradually changing from the product model to the service model,management and technical capacity integration is more and more important.So that project management there is a huge challenge.Project management experience is limited,the actual implementation of the project results and expectations there is a big deviation.Especially in the duration of the project,the project schedule,project schedule control and other aspects of the problem is particularly prominent.At first,use Fishbone Diagram analyze Historical project,summarize the issues about Management process,WBS,Sequence Activities,Estimate Activity Durations,Develop Schedule and Control Schedule.Base on the theoretical knowledge,using the PDM,Three-point estimating and Critical path method develop the systematic time management solution.Finally,through the actual application of similar projects to verify the program effect,the formation of information technology services in the sector in the time management process of the standard model for the information technology services industry,project time management research reference.
Keywords/Search Tags:Information Technology Service, Project Time Management, Three-point estimating, Critical path method
PDF Full Text Request
Related items