Font Size: a A A

Research On The Planning And Control Of Consumption Point Management System Project Construction Of Jilin Rural Credit Cooperatives

Posted on:2017-01-06Degree:MasterType:Thesis
Country:ChinaCandidate:M M ZhangFull Text:PDF
GTID:2309330482988850Subject:Project planning and control management
Abstract/Summary:PDF Full Text Request
Jilin Province Rural Credit Cooperatives consumption point system project is by the Jilin Province Rural Credit Cooperatives, Shanghai Huateng Software System Co., Ltd. on both sides of the joint development aimed increase in Jilin Rural Credit Customer ownership, improve customer loyalty and contribution degree, rich Jilin agricultural products brand connotation and active degree. After consumption point system is come out, the development of Jilin rural credit Sonjica plays a significant role in pushing forward. The consumption point system is one of the key projects of Jilin agricultural letter of 2015, Jilin rural credit in-depth implementation of the "three project" work deployment, "four project" in a great convenience Huimin project.The planning and control of consumption point system project construction process in the research, through the analysis of the status of the project, the depth of excavation of the various factors affecting the progress of the project, and combined with the theory of project management and analysis of its causes and formulate rectification measures, and improve and optimization project progress plan, put forward to ensure the safeguard measures for the smooth progress of the project,finally realizes the timely completion of the project, and ensure the quality of project.In the early stage of the project, due to the chaos of project management,combined with the internal restructuring of Jilin agricultural credit institutions, the work of re division, the replacement of the project manager, leading to the projectschedule is seriously lagging behind. The author replaced the original project manager served as the post of consumption point system project, the project manager of Party A, after taking over the project, on the basis of the five project management process: activity definition, activity sequencing, activity duration estimating, making schedule plan and schedule control to carry out the project schedule management work. Through work breakdown structure(WBS) of the project deliverables and project work into smaller, easier to process a part of management activities, review project. And the critical path method(CPM) for the project’s critical path and the key activities, through the development of measures to ensure the project schedule emphatically pay close attention to the key activities, and improve resource distribution of the project, optimize work flow, make all rush and other measures to make projects enough in within the specified time to complete.This paper is mainly discussed consumption point system project plan and control mode, set up a relatively complete set of project schedule management system for Jilin Rural credit management system integration project, and the formation of a certain organizational process assets, project for the future to provide certain reference and use for reference.
Keywords/Search Tags:Project schedule management, Project planning and control, Work Breakdown Structure(WBS), Critical path method(CPM)
PDF Full Text Request
Related items