The Research Of GD Company For The Cost Control Of Long-distance Pipeline

Posted on:2021-12-11Degree:MasterType:Thesis
Country:ChinaCandidate:M Y WangFull Text:PDF
GTID:2481306092462614Subject:Business Administration
Abstract/Summary:PDF Full Text Request
With the rapid development of the world economy,the demand for energy is also increasing,and oil and natural gas still occupy most of the energy market.For the storage and transportation of oil and natural gas,long-distance pipeline is particularly important in various means of transportation due to its many advantages.Long-distance pipeline construction has a long front,huge demand for materials,personnels and equipments,and high cost,which seriously affect the profits of enterprises.GD company,as a long-distance pipeline construction company,has been facing the situation of high cost and thin profit.Its cost control has great significance in improving the company's profit space.Firstly,this paper analyzes the research background and significance,summarizes the literature at home and abroad,and then summarizes the cost control theory and the long-distance pipeline industry.At the same time,it analyzes the cost structure and its influencing factors of the long-distance pipeline.Based on the theory of cost control,this paper analyzes the current situation of cost control of long-distance pipeline in GD company,and it is found that GD company has some problems,such as unreasonable piecework wage plan,lax control of material cost,serious rental situation,high subcontracting settlement price,etc.After that,we will further explore the causes of the problems.Based on the causes of the problems,improvement ideas and corresponding improvement measures are put forward,such as: adjusting the original piece rate wage scheme;strengthening the training of cost control awareness of procurement personnel;building the market price information database platform;strengthening the lease contract signing review and field inspection;establishing the subcontractor grading evaluation system;improving the control of subcontractors in advance and after the event,etc.Then control the cost of each part and reduce the overall cost of the long-distance pipeline project.By improving the cost control of GD company,the cost of GD company will be further controlled,the overall construction cost will be reduced,and the profit space will be improved.Although this paper is based on the background of GD Company,it also has certain reference significance for the long-distance pipeline industry.
Keywords/Search Tags:Long-distance Pipeline, Cost Control, Construction Project Cost
PDF Full Text Request
Related items