As a kind of general management method,project management is gaining more and more people’s recognition,and its management idea has gone into all aspects of life.As a complicated engineering project,the mechanical and electrical installation engineering project of Pudong medical production base is more complex and there are much uncertainties in the implementation process.It is helpful to improve the project management level and ensure the smooth achievement of the project goal in the process of project promotion.In this paper,based on the theory of project management,Pudong medicine production base of mechanical and electrical installation engineering project as the basis,actual detailed schedule and control theory in the application of the mechanical and electrical installation project.Firstly,this paper introduces the general situation of the mechanical and electrical installation project of Pudong medical production base,and establishes the organizational structure according to the actual situation of the enterprises,and clarifies the job responsibilities.When planning the project schedule,mechanical and electrical installation engineering project target should be defined,adopting the WBS task decomposition technique,the network planning technique and the critical path method,preparing a list of the project responsibility allocation and work schedule,mapping network planning,determining the critical path of the project.And adopting the minimum cost acceleration method to optimize the network plan and draw the optimized network plan diagram.In mechanical and electrical installation after the formal implementation of the project,from the organization,economy,management,technology,contract five aspects to take appropriate measures as key points of project control,based on the monitoring of the project,drawing project monitoring table,and taking the earned value method of earned value analysis for project as a whole,to determine the project on schedule and cost performance,analyzing the causes of deviation,and proposing corresponding soling measures.Mechanical and electrical installation project has much contents and has a complicated structure,schedule management plays an important role in ensuring project going smoothly,clear management responsibilities,establishing feasible and effective progress plan,constantly in the process of implementation of the project management and control,to ensure the progress of the duly completed,to ensure that the mechanical and electrical installation of the project schedule management on a new step. |