SQ Hydropower Plant Unit Installation Project Schedule And Quality Management Research

Posted on:2022-08-10Degree:MasterType:Thesis
Country:ChinaCandidate:Z P HeFull Text:PDF
GTID:2492306524472464Subject:Master of Engineering
Abstract/Summary:PDF Full Text Request
With the continuous development of my country’s economy and technology,a large number of old water conservancy and hydropower engineering facilities and equipment invested and built in the early stage of reform and opening up have gradually been unable to meet the current needs.Only to seize the opportunity as soon as possible to complete the upgrade and upgrade of the old facilities and equipment.Transformation can meet current needs.In order to eliminate potential safety hazards in the operation of power plant units under T Group Corporation,improve operating efficiency,and stabilize grid operating conditions,T Power Generation Co.,Ltd.responded to the call of the superior group company to fully implement the transformation and installation of SQ hydroelectric power plant units.How to efficiently organize the various work of the power plant unit equipment renovation project,what management aspects should be focused on,can effectively complete the schedule plan,ensure the quality of the project,and then improve the management efficiency of the entire project.And the project organization’s current problems to be solved urgently.Based on the above situation,the author puts forward the research and analysis of project schedule and quality management according to the needs and actual situation of SQ hydroelectric power plant unit installation project management work.This article attempts to integrate the methods and means of project schedule and quality management into the entire life cycle of the installation and implementation of the entire unit,using the network planning technology of project schedule management as the link,to implement scientific planning and control of the project schedule;at the same time,it will also The idea and concept of total quality management are combined to strictly implement the whole process of quality control and control,thereby opening a new scientific management model of SQ hydroelectric power plant unit installation project progress and quality in two dimensions.The full text is divided into five parts for research and analysis.First,it explains the background of the full text research,indicates the methods and structure used,etc.;then studies the related theories of project schedule and quality management,and summarizes and summarizes the current research status at home and abroad;Next,with the help of project description,related organizational structure and unique analysis,the basic situation of the project was summarized;then,WBS,network planning technology,critical path and earned value analysis and other methods and methods were used to try to compile SQ hydroelectric power plant units.The installation project schedule and scientific control are carried out in order to achieve a more scientific project schedule management and ensure that the project is delivered on schedule;then in accordance with the basic ideas and main content of project quality management,with the help of flowcharts,fault tree analysis,control charts,etc.Methods and tools,try to make reasonable planning,full guarantee and strict control on the quality of SQ hydroelectric power plant unit installation project,in order to form an excellent guarantee for project quality management,and comprehensively improve the quality level of the entire project;the last is Summarize the full text research.The research on the progress and quality management of the installation project of SQ hydroelectric power plant is based on the national and industry engineering technology and construction management specifications,combined with the author’s years of engineering construction practice and experience summary,to a certain extent,will generate electricity for T The company will promote the improvement of the construction and renovation of water conservancy and hydropower projects in the future,which can be used as a reference and reference for future management personnel of various water conservancy and hydropower project construction projects.
Keywords/Search Tags:Water conservancy and hydropower engineering, unit installation project, schedule management, quality management
PDF Full Text Request
Related items