| Project evaluation is sort of the most important part in the whole project life cycle,a project cycle after the walk,objective and comprehensive analyses each part of the project,tn accordance with the time sequence of project implementation,experience and lessons were summarized from the perspective of each project participant,from project preparation,feasibility study report,review to project design,construction,acceptance and operation.This can draw valuable lessons and experience,the construction project encountered a similar situation,It can also be used as a reference.Project evaluation is an effective means of constraints,the project investment is missing an important part of project management,project evaluation summary of reference conclusions are valuable and have,more reasonable and scientific decision,is advantageous to the project project owner do better preparation,more accurate investment and management,eventually get higher rates of return on investment.Paper with "rural drinking water transform project as the theme of this study basing on the theory of project data and related literature,established a set for the project after the evaluation index system,will be recorded in the project cycle data integration analysis,the implementation of each part of the assessment and calculation,besides,doing the index system of index data computation analysis,the evaluation results are obtained.For rural drinking water improvement project after project evaluation research is not a lot,hope to the future enterprise similar rural drinking water reform engineering project implementation,management and decision-making to provide some reference value,and contribute to improve enterprise’s financial benefits,from these aspects,this research is very meaningful for the practical application in the producing activity and the promotion of the management theory. |